My WebLink
|
Help
|
About
|
Sign Out
Home
2016-04-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-04-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 9:17:57 AM
Creation date
4/22/2016 9:02:41 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/26/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
170 an educational aspect as to how this system functioned and the importance of that <br /> 171 function beyond that of a standard type of road construction. <br /> 172 <br /> 173 At the request of Chair Stenlund, Mr. Freihammer clarified that the drainage from the <br /> 174 railroad abutment was not close to the private homes; with the homes located to the north <br /> 175 with short or no driveways. Mr. Freihammer noted that the south side of the road was <br /> 176 railroad right-of-way and sits higher than the road with a short-steep bank; and only <br /> 177 approximately 15' between the rails and road. Mr. Freihammer advised that this project <br /> 178 would only make improvements where the easement is, but no further into the railroad <br /> 179 right-of-way, which was in very close proximity. <br /> 180 <br /> 181 Since this is a low-volume road, Chair Stenlund asked staff if there was any concern with <br /> 182 not having a curb constraint to support holding in the pavers to avoid their spreading over <br /> 183 time. <br /> 184 <br /> 185 Mr. Freihammer reiterated that the construction of the pavers en-mass as a block and tied <br /> 186 together should not result in any vertical displacement. <br /> 187 <br /> 188 Mr. Culver advised that staff anticipated this item on the March 28, 2016 City Council <br /> 189 agenda requesting authorization to order a feasibility study. If approved, Mr. Culver <br /> 190 advised that a more detailed analysis and preliminary design would be completed for <br /> 191 subsequent City Council review and approval. At that point, and upon approval, staff <br /> 192 would order a preliminary project hearing, seek City Council authorization to proceed, <br /> 193 and after completion, a final assessment hearing would be held for affected property <br /> 194 owners based on the actual construction costs; at which point the assessments would be <br /> 195 levied accordingly. <br /> 196 <br /> 197 At the request of Member Seigler, Mr. Culver confirmed that the residents had asked for <br /> 198 this, that the gravel road needed improvement, and noted that staff had been working with <br /> 199 them on a resolution for several years as Mr.Freihammer had mentioned. <br /> 200 <br /> 201 Motion <br /> 202 Member Cihacek moved, Member Thurnau seconded, recommending to the City <br /> 203 Council to proceed with a feasibility study for the South Lake Owasso Private Drive <br /> 204 Storm Sewer Improvements as presented by staff. <br /> 205 <br /> 206 Ayes: 7 <br /> 207 Nays: 0 <br /> 208 Motion carried. <br /> 209 <br /> 210 6. Review of Tour <br /> 211 In part as recognition of Chair Stenlund's last meeting with the group, Mr. Culver <br /> 212 thanked him for his six years of service on the PWETC, and the last few as its <br /> 213 Chairperson. Mr. Culver noted the appreciation of the community and staff of <br /> 214 Member Stenlund and his valuable and vocal service as a member of the PWETC, <br /> Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.