Laserfiche WebLink
45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />65 <br />66 <br />67 <br />68 <br />69 <br />70 <br />71 <br />72 <br />73 <br />74 <br />75 <br />76 <br />77 <br />78 <br />79 <br />80 <br />81 <br />82 <br />83 <br />84 <br />85 <br />86 <br />87 <br />88 <br />89 <br />90 <br />Roseville PWET Commission Meeting Minutes <br />Page 2, January 24, 2017 <br />At the request of Member Seigler, Mr. Culver reviewed the recent Blaine, MN <br />water supply problem related to their software and SCADA system glitch. After <br />that occurrence, Mr. Culver assured the PWETC that, while this type of software <br />issue could happen with any system, including Roseville's, in addition to checks <br />and double checks in place, Roseville city staff had been diligent in inspecting the <br />system to ensure its operational integrity. <br />Member Wozniak reported that he had recently driven the new Twin Lake <br />Parkway extension, opining it looked good. <br />Mr. Culver noted it would be more functional with in of the signal next <br />spring, with the installation cost paid for by Rosevi generating the need, but <br />future maintenance and upkeep paid by Ramsey n ith restriping Fairview <br />Avenue as a 3 -lane section. <br />Member Wozniak further reported that h d recently been ale via letter from <br />At the request of Chair Cihacek, r. ve d that some of those homes <br />requiring sipho ' lustered w others at random locations across the <br />city, depend' on the th of their ice lines that should ideally be at 7' to 8' <br />deep. As plea n the case o <br />that his line w s ' to 5' d <br />the City of Roseville to begin running to av ' waterline fr s, one of <br />approximately 120 households needing to o. <br />Mr. Culver advised that, w major street enance is performed in those <br />areas, the depth of water lines be correcte , atin the need to run water <br />any longer. <br />tuber Wozniak's, Mr. Culver reported <br />Mr. Culver reported that this more <br />of reasons, including but not limited to <br />PIS way Iles for some reason or perhaps due to incorrect <br />ations a ime er. <br />Iver noted t the®communication items included a memorandum dated <br />Janu 7, 2017 Attachment C) to the PWETC from the Community <br />Develo t Dep ent introducing the comprehensive plan update process and <br />providing e into the commission's role during the process. <br />5. Snelling Avenue Project <br />City Engineer Jesse Freihammer introduced MnDOT Project Manager Chad <br />Casey for a short presentation on the upcoming Rehabilitation Project (S.P. 6216- <br />127) Highway 51/Snelling Avenue from Como Avenue to Highway 36 <br />As part of the presentation for this project with a cost estimate of $6,800,000, Mr. <br />Casey reviewed the anticipated schedule with bid letting in February and <br />construction start in April; with a projected October 2017 completion date. Mr. <br />Casey clarified that interim completion dates were weather -dependent; but noted <br />