My WebLink
|
Help
|
About
|
Sign Out
Home
2018_01-23_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_01-23_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 11:00:34 AM
Creation date
2/9/2018 10:55:12 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/23/2018
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: January 23, 2018 <br />Item Description: Communication Items <br />Public Works Project updates: <br />• Water Booster Station Phase 1 <br />Item No: 4 <br />o Work on the booster station upgrade is approximately 50% completed. The <br />underground piping has been replaced and the new slab for the generator has been <br />placed. Work to install the generator and new electrical service should be <br />completed by March. <br />Walsh Lift Station Project <br />o Project has been awarded. Construction will most likely start sometime in early <br />spring of 2018. <br />• Parks Renewal Pathway Project <br />o The contractor is currently installing new sidewalks/pathways in the following <br />locations; <br />• North side of County Road B between Dale St and Sandhurst (Completed) <br />• East side of Lexington between Roselawn Ave and County Road B (75% <br />Complete) <br />• West side of Victoria between County Road C and Woodhill Drive <br />• A new pathway within Tamarack Park from Farrington St to the new <br />playground equipment. <br />o Work is anticipated to be completed next Spring <br />• 2018 Sewer CIPP <br />o This year's project involves lining 6.0 miles of sanitary sewer pipe and two small <br />segments of storm sewer. Veit & Companies was awarded the project in <br />November and will begin work on the project in early 2018. <br />Lounge Lift Station <br />o This lift station will be rehabbed in the spring with new pumps, controls and a <br />new forcemain. Bids were opened on January 18 and the low bidder was Pember <br />Companies. The project is scheduled to be awarded January 29. <br />Minnesota Department of Transportation updates: <br />• County Road B2 and Snelling signal replacement project should have the new signals in <br />operation by January 18. Final cleanup will take place in the spring. <br />• MnDOT is finalizing plans to perform pavement maintenance on 35W south of TH 36 in <br />2018. Included in this project will be the replacement of the traffic signal at Cleveland <br />and County Road B. There will be impacts to some ramps in Roseville including the <br />Cleveland Ave/County Road B ramps and access to TH 280. Staff will bring more <br />information on this project to the Commission as details are made available. <br />Misc. Items: <br />• Neel Energy recently informed staff that they will begin retrofitting existing cobra head <br />Neel leased lights with LED fixtures. The process is expected to be complete by the end <br />
The URL can be used to link to this page
Your browser does not support the video tag.