Laserfiche WebLink
24. The cutrentlicense center is ADA accessible. <br />25. Access to public restrooms is required. However, they are seldom used. <br />26. Passport processing time can be up to an hour. <br />27. There are currently two lines for passports and that is not sufficient. <br />28. The upcoming requirement for enhanced license may trigger more customer traffic; January 2018 is the <br />cutoff date. <br />29. The City does their own IT; full support, security, computers, etc. <br />30. Security will Is e a big consideration with the new license center. <br />a. They have a safe and secure and storage room; secure storage is required for all tabs and license <br />plates. <br />31. The license center provides TV for the customers. <br />32. The maintenance facility is the secondary Is art o fthe proj set. <br />33. Plans, staff list and vehicle lists o fthe maintenance facility were requested by Koded <br />34. Visits to other Ko del designed maintenance facilities could be coordinate d if desired. <br />35. There is currently a need for seasonal, maintenance, parks, and re creation storage. <br />36. There is a deficiency in maintenance facility yard space. <br />37. The City is looking for recommendations on how they can better use their current maintenance facilities <br />ecognizing that they will not be building a new maintenance facility in the short term. <br />38. The City is courrently leasing a 6,000 SF storage facility that is mostly filled with impound vehicles.Thi s <br />leased space may not be available in the future. <br />39. The 2003/2004 remodel of the current maintenance facility increased the vehicle maintenance bay area. <br />However, the facility still has operational issues. <br />40. The current wash bay isn't wide enough and is not a drive through, making it difficult to use. <br />41. Sand/salt is stored on the site. However, they don't have covered storage for any other materials. <br />42. Seasonal storage includes street maintenance equipment, patching equipment, sweepers, etc. <br />43. Atom of both the license center and maintenance facility will be coordinated for next week <br />44. The City will look into existing drawings, soils information, gas tank locations, environmental, etc. <br />Next Meetine: Facilities Tours to be coordinated for next week 10:00am sueeested. <br />End of me cling minutes. <br />The above is a summary of the items discussed indi rating decisions regarding the pmt ect It is not mot to be totally inclusive Normal <br />interpretations and coordinNi on as part of pm fessional services, can and vall change tlredesign Such interpretations and coo hination wall be <br />consistent oath the overall dorechon and N spry of the project choose review and resp end vatic my changes, additi ons or clarifications vntivn <br />fivewodsing days. <br />17.0224 102617roseville mm.docx 0 <br />©2017 Kotler Architectural Group, Ltd. <br />