My WebLink
|
Help
|
About
|
Sign Out
Home
2019_01-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_01-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 2:04:30 PM
Creation date
2/1/2019 1:56:27 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/22/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mark Culver, PE <br />City of Roseville <br />Scenario 3 <br />January 17, 2019 <br />Page 13 <br />Scenario 3 provides the same geometric changes at County Road C2 identified in Scenario 1 but <br />replaces the traffic signal at Lydia Avenue with a grade -separated interchange as shown in Figure 11. <br />The interchange has the benefit of improving flow with a safer pedestrian crossing from east -to - <br />west, but constraints do not allow a full interchange. Therefore, access to Snelling Avenue to/from <br />the north is provided but access to/from the south must be accommodated at County Road C2 <br />utilizing Lincoln Drive or the Snelling Avenue East Service Drive. <br />The construction cost estimate and signal retiming for Scenario 3 is $8,450,000. <br />Figure 11. Grade -separated Interchange at Lydia Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.