Crews have mobilized to the project site. Works consists of CIPP lining the sewer <br />main. Work on this site is scheduled to be substantially completed by the end of <br />July 2019. <br />Ramsey County: <br />• County Road C Reconstruction: Hwy 88 to Long Lake Road <br />o The County will be reconstructing County Road C between Highway 88 in St. <br />Anthony and Long Lake Road in Roseville in 2019. <br />• County Road C will be reconstructed with two lanes in each direction with <br />concrete pavement <br />• An 8 foot bituminous pathway will be constructed on the south side of the <br />road. <br />• The traffic signals will be replaced at Long Lake Road and Walnut Street. <br />• Additional turn lanes will be added on Long Lake Road. <br />• Railroad crossing will be replaced and new signals and gates will be <br />constructed. <br />• Upgraded storm sewer. <br />• Minimal water and sanitary sewer replacement. <br />• Work is scheduled to begin in June. <br />County Road C Concrete Rehabilitation: Cleveland Ave to Snelling Ave <br />o Work includes concrete maintenance on County C between Cleveland Avenue <br />and Snelling Avenue. Work includes ADA upgrades and concrete joint repairs. <br />o Work is scheduled to take place starting in June and go through mid -July. <br />Minnesota Department of Transportation updates: <br />• I-35W MnPASS project - httn://www.dot.state.mn.us/metro/proiects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing I-35 W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave I-35W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I-35W just north of the County Road C <br />ramps to County Road D. <br />o Contract was awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major roadwork will begin Spring 2019. <br />• Work will begin on southbound lanes in 2019 with ramp closures this <br />summer for southbound County Road C and southbound County Road D. <br />• The southbound TH 51 (Snelling Avenue) turn lane to southbound <br />Hamline will be closed for the remainder of the project. <br />Miscellaneous Updates: <br />Capitol Region Watershed District Watershed Management Plan Public Input <br />Opportunities <br />o Capitol Region Watershed District (CRWD) is hosting conversations with <br />residents to learn more about the needs and interests of their community, desired <br />improvements and opportunities to work together to better manage rainwater <br />runoff and achiever cleaner waters. These conversations will help inform the <br />update to CRWD's Watershed Management Plan. Attachment C is a flyer with <br />event details including dates and locations. <br />o A survey can be completed in lieu of attending a meeting <br />• httns://www.survevmonkev.com/r/CapitolRegionWatershedDistrictWMP <br />0 Asset Management Software <br />