My WebLink
|
Help
|
About
|
Sign Out
Home
2021_03-23_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_03-23_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2021 2:14:45 PM
Creation date
3/19/2021 2:05:35 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/23/2021
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey County Updates <br />• County Road B2 Resurfacing and Signal Improvements <br />o This summer the County plans to resurface County Road B2 between Fairview Avenue <br />and Hamline Avenue. As part of the project they will be replacing three signal lights in <br />the corridor and upgrading curb ramps to meet ADA compliance. Additionally, a new <br />pathway will be installed on the north side of County Road B2, under the Snelling <br />Avenue bridge between the ramps. <br />Minnesota Department of Transportation updates: <br />• I -35W MnPASS project - <br />http://www.dot.state.mn.us/metro/projects/3 5wnorthrnnpass/index. html <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of existing <br />I -35W between County Road C in Roseville and Lexington Avenue (County Rd 17) in <br />Blaine. <br />o Repave I -35W and ramps between County Road C in Roseville to just north of Sunset <br />Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area. <br />o Install noise walls on the east side of 1-35Wjust north of the County Road C ramps to <br />County Road D. <br />o Rosegate west of Cleveland Avenue will be closed through November to accommodate <br />bridge reconstruction. <br />o Contract was awarded in October 2018 to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Work in this last year of the project will likely begin in April and will continue through <br />the end of 2021. <br />o The northbound 35W exit ramps to County Road C/Cleveland Avenue are closed and <br />will be closed through the summer until the ramp is rebuilt. The detour is posted to exit <br />onto County Road D. <br />Snelling & Glenhill Improvements <br />o MnDOT plans to make permanent improvements to the Glenhill Road and Snelling <br />Avenue intersection in late April through May. Improvements will continue to restrict <br />the access to a3/4 intersection with no access to north bound Snelling from Glenhill <br />Road. <br />Snelling Signal Upgrades <br />o MnDOT will be replacing the signals at Snelling and County Road C2 and Snelling and <br />Roselawn this summer. Included with the project is upgrades to ADA ped ramps. <br />Traffic will be maintained at all times on Snelling. The current schedule for the work is <br />unknown. <br />Sustainability Update <br />• Partners in Energy <br />o The Energy Action Team will have its fourth meeting on Monday March 22 from 2:30 <br />p.m. - 5:00 p.m., with the goal of narrowing in on goals and actions for the Energy <br />Action Plan. To see information from the past meetings, visit <br />www.Ci!yOfRoseville.com/Partners-in-Energy. <br />0 Voluntary Benchmarking Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.