Laserfiche WebLink
3. List the categories of BMPs that address your construction site stormwater runoff control program. Use the first <br />table for categories of BMPs that you have established and the second table for categories of BMPs that you plan <br />to implement over the course of the permit term. <br />Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br />completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br />and/or maintain the BMPs. Refer to the EPA's Measurable Goals Guidance for Phase II Small MS4s <br />(http://vwAv.epa.aov/npdestpubstmeasurablegoals.pdf). If you have more than five categories, hit the tab key <br />after the last line to generate a new row. <br />Established BMP <br />Measurable goals and timeframes <br />Process/review all applications for compliance with stormwater <br />Inspections by City staff are conducted weekly and following <br />Develop and maintain written procedures for erosion <br />control development review and construction site Create within 12 months of permit authorization, update annually <br />inspection program as needed <br />4. Provide the name or the position title of the individual(s) who is responsible for implementing and/or coordinating this <br />MCM: <br />MS4 Permit Coordinator <br />E. MCM 5: Post -construction stormwater management <br />1. The Permit (Part III.D.5.) requires that, within 12 months of the date permit coverage is extended, existing permittees <br />shall revise their current program, as necessary, and continue to implement and enforce a post -construction stormwater <br />management program. Describe your current program: <br />E.I. The City has a Stormwater Ordinance and Standards that establishes the required use of BMPs for rate control and <br />water quality for new and redevelopment projects. As new developments and redevelopments come in for permit staff <br />reviews them to ensure that they comply with the goals and policies included in the City's comprehensive surface water <br />management plan. Green infrastructure BMPs such as rain gardens, infiltration trenches, biofiltration trenches, vegetated <br />swa/es, etc. are encouraged to be installed to manage post -construction runoff. <br />2. Have you established written procedures for site plan reviews that you will conduct prior to the start of ® Yes ❑ No <br />construction activity? <br />3. Answer yes or no to indicate whether you have the following listed procedures for documentation of <br />post -construction stormwater management according to the specifications of Permit (Part III.D.5.c.): <br />a. Any supporting documentation that you use to determine compliance with the Permit (Part ® Yes ❑ No <br />III.D.5.a), including the project name, location, owner and operator of the construction activity, any <br />checklists used for conducting site plan reviews, and any calculations used to determine <br />compliance? <br />b. All supporting documentation associated with mitigation projects that you authorize? ❑ Yes ® No <br />c. Payments received and used in accordance with Permit (Part III.D.5.a.(4)(f))? ❑ Yes ® No <br />d. All legal mechanisms drafted in accordance with the Permit (Part III.D.5.a.(5)), including date(s) of ❑ Yes ® No <br />the agreement(s) and names of all responsible parties involved? <br />If you answered no to any of the above permit requirements, describe the steps that will be taken to assure that, within <br />12 months of the date permit coverage is extended, these permit requirements are met. <br />E.3. The City will reivew and update current documentation of post -construction stormwater management according <br />to the Permit (Part III.D.5.c). This effort will be completed within 12 months of the date permit coverage is extended. <br />4. List the categories of BMPs that address your post -construction stormwater management program. Use the first table <br />for categories of BMPs that you have established and the second table for categories of BMPs that you plan to <br />implement over the course of the permit term. <br />Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br />completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br />and/or maintain the BMPs. Refer to the EPA's Measurable Goals Guidance for Phase II Small MS4s <br />(http://vwAv.epa.gov/npdestpubstmeasurablegoals.pdf). If you have more than five categories, hit the tab key after <br />the last line to generate a new row. <br />vww.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br />wq-strm4-49a • 5131113 Page 12 of 15 <br />