My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 03212022
Roseville
>
City Council
>
City Council Meeting Packets
>
2022
>
CCP 03212022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 9:53:52 AM
Creation date
3/21/2022 9:53:34 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
3/21/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCA Attachment D <br />DuetotheresidentialnatureoftheentireneighborhoodwestofClevelandthatutilizesCounty <br />RoadB,staffsupportstheremovaloftheculdesac.AculdesacattheendofEustisstreet,80 <br />feetindiameter,wouldstillbeinplaceallowingforturnaroundoffiretrucks,deliverytrucksand <br />othersmallertruckstypicalofresidentialtraffic.Thissortofturnaroundissimilartootherturn <br />aroundsinresidentialneighborhoodswithintheCity. <br />Summary <br />Theproposeddevelopmentwillincreaseexistingtrafficintheneighborhoodslightly.County <br />less <br />RoadBcanhandletheincreaseintrafficontheroadway.Theincreasedtrafficlevelsare <br />thanhistoricpeaktrafficintheneighborhoodandwillbelessthanmanysimilarresidential <br />collectorstreetsinRoseville. <br />ThecurrentpavementofCountyRoadBwasdesignedtohandleCountytrafficloadsand <br />volumes.Thepavementconditionisinneedofrepair,duetotheageoftheroadway.The/źƷǤƭ <br />capitalimprovementplanincludestheentiresegmentofCountyRoadB,westofCleveland <br />Avenue.Thecurrentplanisforareconstructionprojectschedulein2024whichwilladdressthe <br />poorpavementconditionoftheroadway.Anyreconstructionorreconditioningprojectwillbe <br />abletohandlethecurrentandprojectedtrafficfromthisdevelopment.Thereconstruction <br />projectwillpotentiallyallowroadwaydesignimprovementstoimprovedrainage,trafficcalming <br />measuresandothersafetyimprovements,suchasupgradestothepedestrian/bicycletrailtobe <br />implemented.Publicoutreachforthisprojectwillbeaveryimportantrolewhenplanningforthis <br />projectbeginsinthefuture. <br />Pleasecontactmeshouldtherebequestionsorconcernsregardinganyoftheinformation <br />containedherein. <br />Page 11 of 11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.