Laserfiche WebLink
BKV <br />G R O U P <br />A EXECUTIVE SUMMARY <br />operational space over the next 15-years to be able to maintain a high level of service and <br />operations. The most critical need for additional operational space is within the Maintenance <br />Facility, currently the largest facility based on total building area, but also inefficiently occupying <br />buildings of various vintages on the civic campus as well as the leased storage space offsite. The <br />space needs identified are for critical operations; refer to detailed notes within the body of this <br />report for a reflection on the impact of future work -from -home on specific workspace needs in the <br />future. <br />Additional Projected (15-years) Building Area Space Needs: <br />• City Hall - Office / Support Space (includes frond Police Department) <br />+ 11,673 GSF <br />• City Hall - Garage (City Hall & Police +Police Firing Range) <br />+ 9,273 GSF <br />• License Center/Passport <br />+4,676 GSF <br />• Maintenance Facility (not including site area) <br />+ 27,880 GSF <br />Note, the space needs reflect the work environment before the COVID-19 pandemic. If and when <br />the City establishes a remote working policy the space needs for City Hall should be reexamined. <br />However, operational and space needs for the near term do exist for the Police Department and <br />the other departments which reside in City Hall. Some of which could be addressed through <br />reconfiguring existing space for better utilization and improve operations. <br />Near -term Issues and Opportunities <br />There are several items identified by the planning committee for consideration to address <br />operational and spatial challenges. <br />• The City currently leases approximately 7,000 sf of maintenance storage space off -site for a <br />cost of approximately $60,000 annually. The annual cost of leasing could be redirected to fund <br />a storage building onsite at the Civic Campus, improving operational efficiency. <br />• Security improvements at the reception desk for Parks and Recreation department. <br />• Additional work space and offices for Parks and Recreation. <br />• Additional office space for the Police Department to accommodate the increase in personnel. <br />• Additional secure indoor parking for Police vehicles. <br />• Improve the layout of the Engineering Department to increase staff work spaces, provide <br />additional storage, layout, and collaborative areas. <br />• Explore locations for the IT Department; if relocated from City Hall, their 2,200 SF would be <br />available for other interior rework. <br />Refer to the Space Needs Assessment section of this study for further detail on the operational <br />ROSEVILLE CIVIC CAMPUS MASTER PLAN STUDY All GROUP I OERTEL ARCHITECTS 10 <br />