Laserfiche WebLink
BV <br />MASTER PLANNING APPROACH c x -o-u v <br />•` . o <br />-El <br />WGGNNILL DRIVE <br />Jim <br />FaACE�ECENo.� LE BipUGEL -B ICEGEFICE6BNOPERxE STATpX GE BXECB STOPAGE <br />MASTER PLAN - OPTION B <br />This option locates the new Maintenance Facility North of Woodhill Drive, The Maintenance Facility <br />is positioned allowing for multiple points of entry to the site, however site circulation is constrained <br />and not continuous around the facility. A new License Center building is constructed at the corner <br />of Woodhill Drive and Lexington Ave. This allows for the opportunity of constructing a two-story <br />facility with additional office space on the second level that could be used to offset the space <br />shortage at City Hall. A new building is constructed for VFW South of Woodhill Drive with ample <br />parking that can be used as overflow for the Skating Center. <br />Key Attributes: <br />+ Ability to multi -phase implementation: two options, either vehicle storage or office/service first <br />+ License Center visibility from Lexington Ave, can remain in operation as -is during other work <br />+ City Hall visibility from Woodhill Drive <br />+ Central green space <br />- Compact Maintenance site, limiting functionality, flexibility over time, and capacity for growth <br />- Maintenance borders residential area, but building provides a good sound barrier <br />- Site circulation is not continuous around Maintenance Facility <br />Phasing Notes: <br />• Retain License Center and Maintenance operations during construction <br />• Build new Maintenance Center structures to eliminate the need for off -site storage <br />• Phase facilities and growth in portions over time <br />Maintenance Facility and Site Di%erentiators: <br />• Scenano is least ideal of all final options: site area is critically limited, with no ability to adapt to <br />future needs and changes without displacing the License Center or requiring a permanent <br />offsite location for additional Maintenance space needs <br />25 I BKV GROUP I OERTEL ARCHITECTS ROSEVILLE CIVIC CAMPUS MASTER PLAN STUDY <br />