My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 05232022
Roseville
>
City Council
>
City Council Meeting Packets
>
2022
>
CCP 05232022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 11:55:39 AM
Creation date
8/11/2022 11:55:25 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
5/23/2022
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />SECTION 4 – RISK MANAGEMENT PLAN <br />A complete list of all pre-identified risks that the Vendor does not control. <br />Identified Risk 1:Client unhappy with final appearance <br />Sample/first article will be produced in the exact way pads will look when <br />Solution / Strategy: <br />completed. <br />Identified Risk 2:Longer than anticipated lead times for shipping <br />All available shipping services will be reviewed before covers are ready to <br />Solution / Strategy: <br />ship. To ensure on-time delivery to Kaiser for final installation <br />Identified Risk 3: Material delays above anticipated time <br />Added lead times have been incorporated into proposal. Working with the <br />Solution / Strategy: <br />blue material as a cover material will allow for more readily available stock <br />Identified Risk 4: Project delays from other services and vendors within the entire project <br />We will work closely with project management team to identify and react <br />Solution / Strategy: <br />accordingly to delays that arise. <br />Identified Risk 5: <br />Solution / Strategy: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.