Laserfiche WebLink
RCA Attachment A <br />24 CHARGING LEVELS: standardized indicators of electrical force, or voltage, at which an electric <br />25 vehicleÓs battery is recharged. The terms 1, 2, and DC are the most common charging levels, and include <br />26 the following specifications: <br />27 1. Level 1 is considered slow charging with 120v outlets. <br />28 2. Level 2 is considered medium charging with 240v outlets, charging head and cord hard-wired to <br />29 the circuit. <br />30 3. DC is considered fast or rapid charging. Voltage is greater than 240. <br />31 ELECTRIC VEHICLE: a vehicle that operates, either partially or exclusively, on electrical energy from <br />32 the electrical grid, or an off-grid source, that is stored on board for motive purposes. ÐElectric vehicleÑ <br />33 includes: <br />34 1. Battery electric vehicle <br />35 2. Plug-in hybrid electric vehicle <br />36 ELECTRIC VEHICLE CHARGING STATION (EVCS): a public or private parking space that is served <br />37 by battery charging station equipment that has as its primary purpose the transfer of electric energy (by <br />38 conductive or inductive means) to a battery or other energy storage device in an electric vehicle. <br />39 ELECTRIC VEHICLE CHARGING INFRASTRUCTURE: conduit/wiring, structures, machinery, and <br />40 equipment necessary and integral to support an electric vehicle, including battery charging stations and <br />41 rapid charging stations. <br />42 ELECTRIC VEHICLE PARKING SPACE: any marked parking space that identifies the use to be <br />43 exclusively for the parking of an electric vehicle. <br />44 ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE): any equipment or electrical component used in <br />45 charging electric vehicles at a specific location. EVSE does not include equipment located on the electric <br />46 vehicles themselves. <br />47 ELECTRICAL CAPACITY shall mean, at minimum: <br />48 1. Panel capacity to accommodate a dedicated branch circuit and service capacity to install a <br />49 208/240V outlet per charger; <br />50 2. Conduit from an electric panel to future EVCS location(s). <br />51 LOT WIDTH: The horizontal distance between the side lines of a lot measured at right angles to its depth <br />52 along a straight line parallel to the front lot line at the minimum required structure setback line.The <br />53 minimum distance between: <br />54 1. Side lot lines measured at the midpoint of the building line; and <br />Page 2 of 32 <br /> <br />