My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01480
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1400-1499
>
pf_01480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 3:41:04 PM
Creation date
2/15/2024 3:30:23 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1480
Planning Files - Type
Rezoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paul pink and associates, inc. <br />June 7, 1984 <br />Memo Re Pavilion Place <br />Page Two <br />7. The street improvement and drainage feasibility studies will be <br />presented to the City Council at 7:00 p.m. on July 11th, 1984. It <br />was recommended that the developer and architect attend council meeting. <br />Ian requested that David transmit copies of feasability studies to Paul <br />Pink and Associates as soon as completed. <br />8. <br />David Drown suggested that the City phase construction of roadway to better <br />accommodate construction access for the mall building <br />and parking <br />structure. The city intends to begin construction <br />of proposed roadway <br />in the spring of 1985 and complete construction by <br />July 1st, 1985. During <br />roadway construction,temporary project construction <br />access permit1from <br />County Road B2)must be obtained from County. <br />9. <br />Dick Dreher summarized the results of the neighborhood meeting on May 22, <br />1984. Howard and Chuck requested that Dick provide <br />the city with a letter <br />of changes to the P.U.D. submittal requested by the <br />neighbors. <br />10. <br />David requested that the contractor not store earth <br />at the Southeast corner <br />of the site where Bruce Avenue and Fry Street drain <br />unto site. Ian <br />stated that construction limits will be established <br />on plans to allow <br />street drainage during construction. Dave Uerifi'ed <br />that bhe above situation <br />has been communicated to Ken Adolf (Civil Engineer). <br />Drainage from Fry <br />Street and Bruce Avenue must be accommodated by the <br />on site drainage study. <br />11. <br />Chuck su?gested that development provide Fry Street <br />right of way easement <br />to city at eastern property linejfor snow storage. <br />City and ARI will <br />negotiate easement at later date. <br />IM/jd <br />cc: All Present <br />Orrin Ericson <br />Joe Weis <br />Tim Reiner <br />Ken Adolf <br />
The URL can be used to link to this page
Your browser does not support the video tag.