Laserfiche WebLink
DIVISION 1 <br />GENERAL REQUIREMENTS <br />01640 - SI;aSTITUTIONS AND PRODUCT OPTIONS <br />7. REJECTION OF SUBSTITUTION OR OPTIONAL ITEMS <br />A. Substitutions and/or options will not be considered if: <br />i <br />1. They are indicated or implied on shop drawings, or project data <br />submittals, without formal <br />request submitted in accord with this <br />section. <br />2. Acceptance will require substantial revision of Contract Documents, or <br />building spaces. <br />3. If they are, in Owner/Architect's opinion, not equal to base product <br />specified, or will not perform adequately function <br />for which intended. <br />r <br />4. Re quest for substitution does not indicate specific item for which <br />request is submitted. Acceptance of <br />■ <br />a manufacturer only will not be <br />made, listing of a manufacturer will imply acceptance of them <br />as a <br />supplier of a product which complies with specified item. <br />5264 <br />SECTION 01640 - q <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />