Laserfiche WebLink
1 <br />1 <br />i <br />1 <br />1 <br />1 <br />I <br />1 <br />1 <br />I <br />1 <br />1 <br />11 <br />DIVISION 3 <br />CONCRETE <br />03300 - CAST -IN -PLACE CONCRETE <br />C. Broom or belt finish: Immediately after concrete has received a float <br />finish as specified, give it a coarse transverse scored texture by drawing <br />a broom or burlap belt across surface, <br />D. Slab shall be cured as noted under Article 4, Item F. <br />5264 <br />SECTION 03300 - 11 <br />