My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01485 pg 1-2 of 3
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1400-1499
>
pf_01485 pg 1-2 of 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 10:14:49 AM
Creation date
2/16/2024 10:07:04 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1485
Planning Files - Type
Rezoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING REPORT <br />CASE NUMBER: <br />APPLICANT: Discus of Roseville, Inc. <br />Page .2 <br />their .food, and carry it to the tables. This enables customers to "build <br />their:own hamburger". There is a small bar with eleven stools, and drinks <br />are available with the food. The east side of the building has a "sun <br />roof", with a patio area around. There is a high parapet around the <br />building which hides the mechanical equipment on the roof. The exterior <br />structure will be brick, with similar treatment on all four sides. <br />4. The request before the Planning Commission and Council is for the rezoning <br />The site plan as submitted as evidence of the need, and demonstration of <br />what is to be built. Because there is a park on the north side (zoned R--1) <br />the site plan is subject to review of the staff to ascertain compatibility <br />and landscaping, building materials, etc. If the staff does not approve <br />the design, the decision can be appealed to the City Council. Because there <br />are no special use permits or variances involved, the development,of the <br />site in accordance with the plan submitted cannot be a condition. <br />Construction is proposed to occur immediately after approval of -the <br />rezoning. Thus, it is fairly certain that the building will be constructed <br />as proposed and will be subject to the staff review prior to issuance of <br />the building permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.