Laserfiche WebLink
(b) Truckloads are sampled by obtaining and combining <br />e <br />samples from the ndoboequivalentttom Of <br />' <br />truck, by means o f°a'BacodnlBomber <br />sampling device; <br />' <br />(c) Drums are samplUdbthenbunglng a hole oretheccenternof <br />glass tube through <br />the dru,n to :he bottom; <br />d) In drums, if the tube inserted locates a sludge <br />is inserted to <br />layer on the bottom, a dipstick <br />sludge height (volume). Then separate <br />measure <br />samples of sludge and liquid are taken and <br />combined. <br />Samples brought to the laboratory are logged and <br />labeled. Labeling information includes: <br />Generator Name <br />sampling date <br />Hauler if other than the Facility operator <br />Manifest Number <br />Waste Type <br />Facility personnel review the process involved in <br />be'_ng sampled to identify any <br />generating the waste <br />potential source of additional contamination that could <br />appear in the delivered waste. <br />Security PI-an,Procedure, and Equipment. <br />6. S e c u Y --- <br />6.10 Site Security. Stringent security measures will <br />unauthorized entry onto the <br />be instituted to prevent <br />and to prevent possible disturbance <br />Facility property <br />of hazardous waste management activities. This plan <br />describes the precautions taken to prevent unauthorized <br />of the facility. <br />entry onto the active portions <br />The paved driveway off of Rose Place entering onto the <br />to the Facility, A six- <br />site will be the only access <br />the site and <br />foot chain -link 4.ance surrounding <br />containing sliding gates at the entrance to the site <br />unloading. <br />and at the entrance to the truck parking and <br />the buila.,ng will be pr <br />area at the back part of <br />The gate will be closed at 6:30 p.m. and will not open <br />be operated by <br />until 6:30 a.m. The sliding gates will <br />will be limited <br />remote control. The building entrances <br />south sides of the building. <br />to those on the east and <br />The gates and vehicle access are indicated on the Plot <br />mi,dsee.ion <br />Plan, Attachment 2. The gate at the central <br />the truck parking and <br />of the site entering onto <br />unloading area will be controlled by electronic gate <br />openers. The gate will remain closed, except wheemical <br />trucks delivering <br />shipments are received. All <br />28. <br />k <br />