Laserfiche WebLink
' <br />containers which will be stacked .two (2) high. Minimum <br />be wen each <br />provided <br />ebet <br />isle space of two feet will <br />for thorn g p each <br />row of drums to allow <br />drum in storage. ;This design allows for a visual, as <br />of each individual <br />well as a "hands-on," inspection <br />consland/orotre�chestwill <br />stingcontainer. <br />Containment areas <br />curbs, <br />floor surfaces, containment <br />inspected f orevidence of accumulate <br />be visually <br />liquids and structuraldefects. <br />routin <br />7.24. Tank Inspection - This section delineates t ee <br />which requirelags <br />tanks and related structures <br />reinforced <br />inspections. Carbon steel�ankbewill be used for <br />and Plasti-steel <br />plastic, s anonhazarou <br />storage and treatment of the hazardoui meatnassociateds <br />q p <br />industrial waste. All monitoring <br />as automatic shut -offs and level <br />with each tank, such <br />will be inspected on a daily basis to insure <br />controls, level of each tank <br />proper working order. The liquid <br />yrof the <br />to check the accuracy <br />,level <br />will be measured <br />reading elements by comparison of the lts <br />Control equipment, including valves, nozzels, pumps and <br />inspected every <br />P. will be visually and <br />deterioration, corrosion, or <br />day to detect any signs oz of <br />lead to malfuattention <br />erosion which could welllbe <br />'als. Particular to <br />hazardous materi joints and seams <br />all pipe elbow flanges, <br />given to <br />detect possible deterioration and/or leaks. <br />curbs and <br />The concrete containment <br />ingoeachetank) will be <br />su�roundas <br />foundations immediately deterioration, g <br />oI. <br />visually inspected for signs will e <br />surface of theerosionwlcrabks <br />or erosion. The exterior <br />inspected to detect corrosion, <br />visually <br />and leakage from seams and fixtures. <br />7.25 Annual Ins ection of Tanks. At least annually, <br />be emptied of all materials <br />all tanks and piping will <br />inspection. All tanks will not, <br />to allow for interior <br />be emptied for inspection at the same <br />a <br />however, <br />Instead, such operations will be scheduled one at <br />be shut down. <br />time so that the Facility will not <br />internal tank inspection can be made, <br />Before an <br />the following steps must be to <br />(1) Feed shut-off. The tank inlet must either <br />blanking the line or by <br />be blocked off by <br />locking out two valves in a <br />closing and <br />leading to the tank A drain must <br />series <br />be provided between the two valves; it <br />the tank <br />shall be locked open during <br />and inspection. Pumps must <br />preparation <br />31. <br />1 <br />