My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01576
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 3:21:11 PM
Creation date
2/16/2024 3:17:10 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1576
Planning Files - Type
Rezoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING REPORT <br />DATE: 3 October 1984 <br />CASE NUMBER: 1547-84 <br />APPLICANT: Metropolitan Recovery Corporation <br />LOCATION: South of Rose Place, Easterly of <br />Walnut Street <br />ACTION REQUESTED: Amendment to Zoning Ordinance <br />PLANNING CONSIDERATIONS: <br />1. Metropolitan Recovery Corporation, the applicant in this case, is a <br />recently formed entity consisting of 27 companies who have joined together <br />to develop a metals processing treatment and recovery facility to treat <br />their residual waste discharge, which up to now has largely been flushed <br />down the Metropolitan sewage system resulting in heavy metals pollution of <br />the river system below the Pig's Eye Treatment facility to points through <br />and beyond Lake Pepin to the south. You are all familiar with this <br />problem to varying degrees. <br />Federal and state legislation requires that such trace amounts of heavy <br />metals such as cadmium, chrome, copper, lead, zinc, and nickel be removed <br />from the effluent from municipal treatment plants and all industrial users <br />discharging to such plants. A recent study committee from the <br />Metropolitan Council has recommended that a central plant be constructed <br />in the Twin Cities to handle the industrial processing required. Though <br />the processes involved are safe, they are in some cases expensive, and <br />therefore, a group of 27 (earlier consisting of 26) users propose to <br />construct a facility that will serve their needs as well as a long list of <br />potential users in and near the Metropolitan Area. This concept has been <br />endorsed by the EPA and the PCA, and is, of course, heavily controlled by <br />both. <br />2. The concentration of need in the Twin City Area is, of course, brought <br />about by the extensive high-tech/electronics industrial base in Minnesota. <br />The larger of these companies engaging in metal plating, finishing, and <br />printed circuit fabrication process their industrial wastes within their <br />own facilities. Such companies include Sperry, Control Data, Honeywell, <br />3M, etc. Thus, the facilities being proposed are in fact operating <br />already and constitute no particular hazardous facility in processing. <br />The principal health hazard is in allowing heavy metal residuals to <br />pollute aquatic life which then may be eaten by humans. <br />3. Attached you will find extensive materials submitted by representatives of <br />and for the Metropolitan Recovery Corporation which more adequately <br />describe the proposed facility and its operation. Representatives from <br />the company and from the Minnesota Pollution Control Agency will be at the <br />Planning Commission and Council meetings to further explain and answer <br />questions regarding the proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.