My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01576
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 3:21:11 PM
Creation date
2/16/2024 3:17:10 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1576
Planning Files - Type
Rezoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
residential areas to the site are those located on the <br />south side of I-35W/U.S. 36, and to the northwest in <br />to the south <br />the City of St. Anthony. The neighborhood <br />from the Facility <br />is located approximately 21500 feet <br />in the City of St. Anthony is <br />and the residential area <br />located approximately 2,500 feet from the Facility. <br />Uses immediately surrounding the property include an <br />chips are <br />old Dutch food processing plant where potato <br />and industrial <br />made, a warehouse where chemicals <br />materials are stored, and the Boise Cascade plant where <br />corrigated boxes utilized in part by the food industry <br />the <br />are manufactured. Other than these two uses, <br />surrounding industrial uses are not particularly <br />The impact of the <br />sensitive to the Facility. potential <br />Facility on surrounding uses is described in Section <br />4.30 below. <br />2.45 Stormwater Drainage. Stormwaters from the site <br />will drain to the City system via a pipe along the <br />Lot 1. Piping will connect the <br />western boundary of <br />building roof and all paved areas to the system. <br />to <br />Stormwater will be contained and tested prior <br />if truck spill <br />discharge to the storm sewer only a <br />during a period of precipitation. If a <br />takes place <br />spill occurs during precipitation, then the sumps <br />provided will be pumped to an inside storage or <br />the <br />treatment tank and treated prior to discharge to <br />sewer system. <br />3. Environmental Safeguards. This section describes the <br />procedures, mechanisms, equipment, and structures which <br />of <br />will be used to prevent accidents, contamination <br />supplies, and mitigate the <br />surface or ground water <br />effects of equipment failure or power outages. <br />Additional safety measures are described in Sections 6 <br />and 10. <br />3.10. Loading/Unloading. Material, transfer operations <br />will take place at only two locate <br />will be specifically <br />Facility. These locations which <br />designed and constructed as containment areas are shown <br />on Attachment 2. All material transfer will be carried <br />out with extreme care and caution to minimize the <br />occurrence of leaks or discharges from truck fittings <br />and hoses. <br />Loading and unloading will be performed by trained <br />Facility employees who will be present of allocctimes to <br />insure that an overflow of waste does n r. <br />Loading and unloading operations will occur only after <br />in <br />each shipment has been inspected and sampled <br />waste Analysis Plan. <br />accordance with procedures in the <br />13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.