Laserfiche WebLink
SECTION 02110 - CLEARING AND GRUBBING <br />PART 1. GENERAL <br />1.1 Requirements of Mn/DW Specification 2101-A2 applies as specified. <br />PART 2. PRODUCTS (Not Applicable) <br />PART 3. EXECUTION <br />3.1 Clearing Operations; Requirements of Mn/DOT Specification 2101-B <br />apply as specified. <br />3.2 Grubbing Operations; Requirements of Mn/DOT Specification 2101-C <br />apply as specified. <br />3.3 Disposal Operations; Dispose of all cleared and grubbed material <br />Off -site in a legal manner. <br />3.4 Limits of Clearing and Grubbing; Limits of area to be cleared and <br />grubbed shall in general be within construction limits. When so requested <br />by the owner's representative, the contractor shall leave certain trees in <br />place within the construction limits. These trees will be marked after the <br />ballfields and the walking path have been laved out. <br />3 <br />