Laserfiche WebLink
MEMORANDUM <br />April 19,1991 <br />Page Three <br />B. The walkways will initially be built towards the nonh side of mall center line so that <br />construction may proceed uninterrupted on the south side of the building. When <br />work is fairly complete on the south half of the building, the walkway will be shifted <br />to the south side so that work on the north may be facilitated without significant <br />interruption. <br />C. 2 sets of doors will be constructed in the walkway so that workmen/material may <br />move laterally between the north half and south half if necessary. It is hoped that <br />construction staging can be done so that there is very little cross traffic cutting <br />through the walkway. <br />D. The possibility of installing temporary sprinkler lines down the walkway was raised. <br />As the walkway is temporary and would be relocated approximately halfway <br />through construction, it was felt that the cost would be prohibitive. However, it was <br />agreed that GGCC would install 2 fire extinguishers per walkway. <br />With no fur <br />ther co comments or issues, the foregoing conveys our understanding of items discussed <br />' <br />and conclusions rea hed during this meeting. We assume our understanding to be correct unless <br />notice to the contrary is brought to our attention. <br />SP/jmh <br />8886:4-18M.SP <br />