My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01787
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1700-1799
>
pf_01787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 12:15:36 PM
Creation date
2/21/2024 12:07:40 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1787
Planning Files - Type
Planning-Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 8, 1987 <br />TO: Jim Andre <br />FROM: <br />Craig Waldron <br />SUBJECT: BREAKDOWN OF LEXINGTON SCHOOL SITE COSTS <br />CC: Bob Bierscheid <br />The developer is proposing to pay $1,008,000 for the 8.54 acres, <br />resulting in a cost of $2.71 per square foot. <br />The potential price for the dedicated area was formulated by <br />simply taking ten percent of the total <br />$100,000 figure. The ballpark area costs rwere ecalculatedubythe the <br />developer's attorney, who worked with an appraiser <br />n setting <br />cost of the area in relation to four duplex lots atl$35,000, orhe <br />the $150,000 as originally proposed. <br />At the reduced price of $125,0001 the City is essentially looking <br />at $2.73 per square foot. Thus, the cost for the City is virtually <br />identical to the square foot cost that would be paid by the developer <br />for the total site. p <br />
The URL can be used to link to this page
Your browser does not support the video tag.