Laserfiche WebLink
PLANNING REPORT <br />DATE: <br />CASE NUMBER: <br />APPLICANT: <br />LOCATION: <br />ACTION REQUESTED: <br />PLANNING CONSIDERATIONS: <br />I. The C't <br />2. <br />3. <br />• <br />5 August 1987 <br />1785 <br />Burger King Corporation <br />Southwest Corner of <br />County <br />Road B and <br />Snelling Avenue <br />(see sketch) <br />Variance to Number of <br />Parking Spaces, Parking <br />Location, and Building Setback <br />i Y Staff has been working for the last approximatel <br />with the land owners and tenants in the southwes <br />Road B and Snelling in an attempt to reroute thet corner of County <br />the front of these properties) to the rear of the service road (now on <br />appropriate right-of-way been acquired through these parties. <br />new service road could have been constructed as Had the <br />Snelling Avenue Improvement Project. Attempts negotiations, the <br />Snell-of-wa a part of the current <br />Y, however, proved to be mpts to reroute the public <br />to the fact that the occupants of thensuccessful. <br />owners. <br />Properties are not hePart Of thunderl due <br />underlying <br />Throughout this process, the Burger King people helpful in attempting to come u P P e have been <br />the public right-of-wayP with a movsolution. Particularly <br />King people have metw th the Staf feo�ervice road Failing to acquire <br />partial solution to the frequent Occasionser tohevolve ea <br />west the driveway that now lem by agreeing to widen and <br />Countallows the traffic to proceed southerly ofrohm <br />Y Road B near the west line of <br />has requested a private roadwaythe Properties. <br />of 33 feet in widthevelopment plan curwhich Is The ,proposed <br />ty Staff <br />as a part of this redevelopment as sub ' <br />King. matted b <br />Y Burger <br />Attached Is a statement from them outlining <br />will note that theg their basic <br />route at the west endof <br />proposed heirProperty. <br />proposal. You <br />designprovides for a 33 foot north -south <br />longer drive-thru lane facnlIty winch has <br />Y The design also includes a <br />method of merchandising them Soh 'ha proven to be <br />through Heir drive merchandising <br />facility product. <br />a very successful <br />They now have greater sates <br />purchasing their food people coming Into the restaurant, <br />discussions regarding' and returning to them car. <br />Kin 9 right -of -was Prior to the lengthy <br />9 people have proposed to the traffic movement, the Burger <br />adding onto their popular "sun room". Y an addition to their store by <br />east side of the structure at the northeast corner <br />This addition Is proposed on the <br />People. The existing capacity of the restaurant is and will seat 28 <br />100 seats, the new <br />capacity will be 126 seats. <br />