<br />36 Master Plan, in 2024. <br />37 <br />38 3. Lighting: Streetlights along County Road B2 over I35W will be replaced to restore <br />39 lighting on the pathway side. Existing light poles in the City Hall parking lot will be replaced. <br />40 Staff intends to revisit and update the lighting policy in 2024. <br />41 <br />42 4. Sanitary Sewer System: The City will resume sewer lining with a moderately-sized <br />43 project in 2024 and retain a consultant to assist in development of a larger 2025 sewer <br />44 lining project to address some of the large or critical segments. Minor sewer repairs will be <br />45 performed with the PMP and County Road B Reconstruction Project. A consultant has <br />46 been retained to design upgrades to the Dale/Owasso Lift Station for construction in late <br />47 2024 or 2025. <br />48 <br />49 5. Water Distribution System: Watermain along County Road B will be replaced from <br />50 Snelling Avenue to Merrill Street in coordination with Ramsey County’s County Road B <br />51 pavement project. As a part of the City’s County Road B reconstruction west of Cleveland <br />52 Avenue, new watermain is proposed at Cleveland Service Drive to allow for a loop to <br />53 improve the system. On Hamline Avenue, watermain will be upsized from Josephine Road <br />54 into Arden Hills at the request of Arden Hills; Arden Hills will be responsible for the majority <br />55 of the costs for the watermain upsizing. The agreement to sell water to Arden Hills will be <br />56 updated and renewed in 2024. <br />57 <br />58 6. Storm Sewer System: Much of 2024’s storm water funds will be used for storm sewer <br />59 upgrades and pond improvements associated with the County Road B Reconstruction, <br />60 nearby PMP, and the Twin Lakes Trail Phase 2 projects. Additionally, staff will begin project <br />61 planning for City Ditch 2 improvements. <br />62 <br />63 7. Retaining Walls: Portions of the retaining wall on South McCarrons Boulevard, <br />64 between Glenwood Ave and Woodruff Avenue, will be replaced with a soil nail reinforced <br />65 wall. Bids received in 2023 were high so modifications to the project have been made so it <br />66 can be rebid for 2024 construction. Staff has begun a city-wide audit of retaining walls <br />67 which they hope to complete in 2024. <br />68 <br />69 8. Environmental: City staff plans to work on the following programs and initiatives over <br />70 the next year to help support sustainability and increase recycling: <br />71 Develop a Climate Action Plan using Energy Efficiency and Conservation Block <br />72 Grant funds. <br />73 Implement Energy Action Plan goals. <br />74 Conduct Less Mow May education and outreach. <br />75 Promote Roseville Sustainable Steward program. <br />76 Maintain GreenStep reporting and B3 energy usage tracking. <br />77 Prepare engagement plan for possible Green to Go Ordinance. <br />78 Host Energy Resource Fair in partnership with Lauderdale and Falcon Heights. <br />79 Host Residential EV Ride and Drive in partnership with the American Lung <br />80 Association. <br />81 Implement Environmentally Preferable Purchasing Policy. <br />Page 2 of 5 <br />Qbhf!32!pg!413 <br /> <br />