Laserfiche WebLink
2024 Capital Improvement Plan <br />Project/Initiative Summary <br />Department/Division: Storm Sewer <br />Project/Initiative Title: <br />Storm Infrastructure Rehabilitation <br />Total Estimated Cost: $00,000 <br />Funding Source: Storm Sewer Fund (Utility fees) <br />Annual Operating Budget Impact: $0 <br />Project/Initiative Description: <br />This line item is to replace or rehab portions of the storm sewer system within the city. Many of <br />the storm pipes and structures are over 50 years old and are at the end of the expected design life. <br />The City typically uses this line item to replace pipes as part of the Pavement Management <br />Program (PMP) project, to do other storm sewer replacement as part of larger drainage <br />improvement projects, or to rehab sewer lines with cured-in-place pipe (CIPP) lining projects. <br />CIPP lining coats the inside of the pipe to extend the life of the pipe another 50 years and lessen <br />the risk of flooding and sinkholes due to collapse of pipes. <br />Location: <br />Various Locations in the City <br />Qbhf!227!pg!26: <br /> <br />