My WebLink
|
Help
|
About
|
Sign Out
Home
25_0422_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0422_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 12:28:44 PM
Creation date
10/1/2025 12:27:54 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/22/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />HAM LI N E AVENUE PROJECT <br />County Road C to Snelling Avenue (2026) <br />Overview <br />The City of Roseville, in partnership with Ramsey County and the City of <br />Arden Hills, has combined several construction efforts into one project to <br />make design and construction more efficient, and to limit impacts during <br />construction. The elements of the 2026 Hamline Avenue Project are: <br />New pathway on west side of road from County Road C to Josephine <br />Road. <br />New pathway on east side of road from Josephine Road to Snelling <br />Avenue in Arden Hills. <br />• Resurfacing of the roadway from County Road C to Snelling Avenue (TH <br />Sl) in Arden Hills. <br />• New watermain from Josephine Road to Glen hill Road. <br />Doing the pathways at the same time as the road allows us to narrow the <br />road pavement and lessen the impacts of a new path to trees, yards, and <br />driveways. Doing the watermain at the same time as the road and path <br />projects reduces the amount of time the road may be closed and eliminates <br />the need to pave the road twice. At this time, no permanent easements are <br />anticipated for this work; however, temporary easements may be needed to <br />allow for grading of yards, etc. Schedule information can be found at the <br />bottom of this page. <br />In addition to the 2026 work, in 202S Ramsey County will complete a <br />stormwater improvement project on Hamline at Clarmar Lane. The <br />construction timeline and communications about impacts to the traveling <br />public will be available on Ramsey County's project webpaae. Although the <br />2026 projects will coordinate with the 202S project, the scope of the projects <br />made sense for the drainage project to take place first. <br />Public Engagement <br />The first Neighborhood Meeting is scheduled Mayl, 202S, at Autumn Grove <br />Park from 6-7:30 p.m. The meeting will not include a formal presentation, so <br />attendees are welcome to come at any time to learn about the projects and <br />share their input. Properties near the project received postcards with <br />additional information. <br />Page 54 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.