Laserfiche WebLink
• WayfindingSignage <br />o Pedestrian level signs are being manufactured, and permits being obtained <br />for installation fall2025. <br />• Lighting <br />o New streetlight installations by Xcel per City are underway. <br />o Xcel completed Centre Pointe Drive and Arthur Street lighting. <br />• Bike Plan <br />o About to receive final draft from consultants. Next steps will include review <br />by PWET and the Parks Commission, and the public. <br />o Hamline Avenue bike lane demonstration project is in place. Public input on <br />it, including specifics of what people like or dislike, is appreciated. <br />Other agency project updates: <br />• Ramsey County <br />o Dale Street from Lovell Avenue into St. Paul <br />• Complete. <br />o HamlineAvenue/ClarmarLane Storm Sewer <br />• County to address flooding and aging storm sewer in Fall2025. <br />o County Road D from Highcrest Road to Hwy 88 <br />• ADA upgrades anticipated to begin July21. Mill and overlay to occur <br />later this year. <br />o County Road C 4:3 Conversion from Lexington Avenue to Little Canada Road <br />and bridge over railroad <br />• 4:3 lane conversion with mill and overlay scheduled for 2026. <br />• Bridge redecking or replacement received federal funding also <br />anticipated 2026. <br />• MnDOT <br />o Snelling Design fromTH 36 to Grey Fox Road <br />• In design for 2026 resurfacing and will include off -road pathwaywest <br />of Snelling Avenue from Lydia Avenue to Old Snelling. <br />o TH 280 Design from Wabash Avenue in St. Paul to 135 W <br />• In design for 2026 resurfacing. <br />• Other <br />o G Line (Metro Transit) <br />• Planning and design continue for construction 2026-2028. <br />Engineering Updates: <br />• Megan Deane has started as an Engineering Tech III on July 16. <br />• Interns Anisa Riaz, ReilySieren and Iman Abdullahi are onboarded and working on <br />projects and field inspections. <br />PWET Communications Memo Page 2 <br />Page 4 of 27 <br />