My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural & Engineering Services <br /> <br /> <br />2. Scope of Services <br /> <br />The intent of this section is to identify project Consultant work scope requirements and deliverables to be <br />incorporated into the overall contract for professional services. At a high level, this includes design and/or <br />documentation for the following eight work scope phases: 1) project data collection and space needs <br />programming, 2) concept site planning, 3) schematic design, 4) design development, 5) construction <br />documents, 6) construction bidding assistance and construction permitting assistance, 7) construction <br />administration, 8) project close-out assistance, and 9) neighborhood engagement. <br /> <br />2.1Required Consultant Design Team <br /> <br />Architecture (Consultant Team Lead) <br />Interior Design <br />Civil Engineering <br />Water Resource Engineering <br />Landscape Architecture <br />Structural Engineering <br />Mechanical Engineering <br />Fire Protection Engineering (full design) <br />Electrical Engineering <br />Low Voltage Engineering (full design) <br /> <br />Note: The Consultant lead shall be responsible for identifying and including any additional design team services <br />deemed necessary to successfully complete the project. For example, if not embedded in the ten (10) design <br />disciplines noted above, the Consultant shall be responsible for the design of unique Public Works components <br />including, but not limited to: <br /> <br />o Fuel system and Fuel island/canopy design. <br />o Salt shed and storage bin design. <br />o Wash bay design. <br />o Design of site yard components such as, but not limited to, gates, fencing, site walls, <br />equipment screening and monument sign(s). <br />o Preparation of SWPPP, wetland delineation, tree inventory, and site planning survey(s). <br />o Community Engagement <br /> <br />2.2Contract Exclusions (City Provided Services) <br />A. Cost Estimating <br />Cost Estimating will be completed by the Construction Manager At Risk (CMAR) <br />The Consultant Team will be required to coordinate with the City and CMAR on items including but not <br />limited to: Definition of Division 01 special inspections schedule. <br /> <br /> <br /> <br /> <br />7 <br /> <br />RFP Α MOC & LPCDS, Roseville, MN <br />Qbhf!59!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.