My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural & Engineering Services <br /> <br />2.3.C Schematic Design (30% Package) <br />Based on City acceptance, in writing, of the previous Concept Design phase, the Consultant shall prepare <br />Schematic Design documents consisting of drawings and other documents indicating the scale and <br />relationships of Project components in conformance with the approved space needs programming. <br /> <br />2.3.C-1 Design (SD) <br />The Consultant shall identify the full scope of services required for completing the Schematic Design <br />phase. These tasks shall clearly be defined in the prƚƦƚƭğƌƭ ķĻƷğźƌĻķ ǞƚƩƉ ƦƌğƓ͵ YĻǤ {ĭŷĻƒğƷźĭ 5ĻƭźŭƓ <br />work scope responsibilities include, but are not limited to: <br />o Initial iterations of exterior footprint(s) and internal building layouts. <br />o Initial iterations of exterior building forms via 3D massing models and elevations. <br />o Initial iterations of parking/yard layouts. <br />o Initial stormwater management planning per Rice Creek Watershed District (RCWD) & City <br />requirements <br />o Consultant to perform Geotechnical evaluation <br />o City Council presentation <br /> <br />Meetings: Consultant to define the full scope and quantity. The required meeting minimum for City <br />coordination is as follows: <br />o Regular schedule of Consultant PM and City PM check-in meetings (every other week). <br />o wĻŭǒƌğƩ ƭĭŷĻķǒƌĻ ƚŅ ķĻƭźŭƓ ƦƩƚŭƩĻƭƭ ƩĻǝźĻǞ ƒĻĻƷźƓŭƭ ǞźƷŷ ƷŷĻ /źƷǤƭ ta ΛƒƚƓƷŷƌǤΜ͵ <br />o Final SD presentation to City PMT. <br />o Cost estimate review meeting. <br />Deliverable(s): Consultant to define the full scope. The required minimum is as follows: <br />o Schematic Design package: drawing set with additional design scope narratives as needed per <br />design team discipline. <br />o Geotechnical report <br />o Tree Inventory report. <br /> <br />2.3.C-2 Cost Estimating and City Review Period (SD) <br />The Consultant shall distribute the Schematic DesiŭƓ ķĻƌźǝĻƩğĬƌĻƭ Ʒƚ ƷŷĻ /źƷǤƭ ğǞğƩķĻķ /a!w ŅƚƩ <br />their use in providing updated cost estimates. The Consultant <br />shall attend a cost estimate review meeting with the CMAR and include a 3-week pause in the design <br />schedule for this budget analysis and City review period. <br /> <br />2.3.D Design Development (60% Package) <br />Based on City acceptance, in writing, of the previous Schematic Design phase, the Consultant shall prepare <br />Design Development documents consisting of drawings, outline specifications and other documents <br />ƭǒŅŅźĭźĻƓƷ Ʒƚ ķĻƭĭƩźĬĻ ƷŷĻ ƭźǩĻ ğƓķ ĭŷğƩğĭƷĻƩ ƚŅ ƷŷĻ ƦƩƚƆĻĭƷƭ ĬǒźƌķźƓŭΛƭΜ ğƓķ ƭźƷĻͲ ƩĻƌğƷźǝĻ Ʒƚ ğƩĭŷźƷĻĭƷǒƩğƌͲ <br />structural, mechanical and electrical systems. <br /> <br />2.3.D-1 Design (DD) <br />The Consultant shall define the full scope of services required for completing the Design Development <br />ƦŷğƭĻ͵ ŷĻƭĻ ƷğƭƉƭ ƭŷğƌƌ ĭƌĻğƩƌǤ ĬĻ ķĻŅźƓĻķ źƓ ƷŷĻ ƦƩƚƦƚƭğƌƭ ķĻƷğźƌĻķ ǞƚƩƉ ƦƌğƓ͵ YĻǤ 5ĻƭźŭƓ <br />Development work scope responsibilities include, but are not limited to: <br />10 <br /> <br />RFP Α MOC & LPCDS, Roseville, MN <br />Qbhf!62!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.