Laserfiche WebLink
Architectural & Engineering Services <br /> <br />2.3.C Schematic Design (30% Package) <br />Based on City acceptance, in writing, of the previous Concept Design phase, the Consultant shall prepare <br />Schematic Design documents consisting of drawings and other documents indicating the scale and <br />relationships of Project components in conformance with the approved space needs programming. <br /> <br />2.3.C-1 Design (SD) <br />The Consultant shall identify the full scope of services required for completing the Schematic Design <br />phase. These tasks shall clearly be defined in the prƚƦƚƭğƌ͸ƭ ķĻƷğźƌĻķ ǞƚƩƉ ƦƌğƓ͵ YĻǤ {ĭŷĻƒğƷźĭ 5ĻƭźŭƓ <br />work scope responsibilities include, but are not limited to: <br />o Initial iterations of exterior footprint(s) and internal building layouts. <br />o Initial iterations of exterior building forms via 3D massing models and elevations. <br />o Initial iterations of parking/yard layouts. <br />o Initial stormwater management planning per Rice Creek Watershed District (RCWD) & City <br />requirements <br />o Consultant to perform Geotechnical evaluation <br />o City Council presentation <br /> <br />Meetings: Consultant to define the full scope and quantity. The required meeting minimum for City <br />coordination is as follows: <br />o Regular schedule of Consultant PM and City PM check-in meetings (every other week). <br />o wĻŭǒƌğƩ ƭĭŷĻķǒƌĻ ƚŅ ķĻƭźŭƓ ƦƩƚŭƩĻƭƭ ƩĻǝźĻǞ ƒĻĻƷźƓŭƭ ǞźƷŷ ƷŷĻ /źƷǤ͸ƭ ta ΛƒƚƓƷŷƌǤΜ͵ <br />o Final SD presentation to City PMT. <br />o Cost estimate review meeting. <br />Deliverable(s): Consultant to define the full scope. The required minimum is as follows: <br />o Schematic Design package: drawing set with additional design scope narratives as needed per <br />design team discipline. <br />o Geotechnical report <br />o Tree Inventory report. <br /> <br />2.3.C-2 Cost Estimating and City Review Period (SD) <br />The Consultant shall distribute the Schematic DesiŭƓ ķĻƌźǝĻƩğĬƌĻƭ Ʒƚ ƷŷĻ /źƷǤ͸ƭ ğǞğƩķĻķ /a!w ŅƚƩ <br />their use in providing updated cost estimates. The Consultant <br />shall attend a cost estimate review meeting with the CMAR and include a 3-week pause in the design <br />schedule for this budget analysis and City review period. <br /> <br />2.3.D Design Development (60% Package) <br />Based on City acceptance, in writing, of the previous Schematic Design phase, the Consultant shall prepare <br />Design Development documents consisting of drawings, outline specifications and other documents <br />ƭǒŅŅźĭźĻƓƷ Ʒƚ ķĻƭĭƩźĬĻ ƷŷĻ ƭźǩĻ ğƓķ ĭŷğƩğĭƷĻƩ ƚŅ ƷŷĻ ƦƩƚƆĻĭƷ͸ƭ ĬǒźƌķźƓŭΛƭΜ ğƓķ ƭźƷĻͲ ƩĻƌğƷźǝĻ Ʒƚ ğƩĭŷźƷĻĭƷǒƩğƌͲ <br />structural, mechanical and electrical systems. <br /> <br />2.3.D-1 Design (DD) <br />The Consultant shall define the full scope of services required for completing the Design Development <br />ƦŷğƭĻ͵ ŷĻƭĻ ƷğƭƉƭ ƭŷğƌƌ ĭƌĻğƩƌǤ ĬĻ ķĻŅźƓĻķ źƓ ƷŷĻ ƦƩƚƦƚƭğƌ͸ƭ ķĻƷğźƌĻķ ǞƚƩƉ ƦƌğƓ͵ YĻǤ 5ĻƭźŭƓ <br />Development work scope responsibilities include, but are not limited to: <br />10 <br /> <br />RFP Α MOC & LPCDS, Roseville, MN <br />Qbhf!62!pg!354 <br /> <br />