My WebLink
|
Help
|
About
|
Sign Out
Home
26_0224_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0224_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 10:04:05 AM
Creation date
2/27/2026 9:59:56 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/24/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Lighting <br />o Intersection lighting in eastern Roseville planned for 2026. <br />o Meetings with Owasso Hills have been occurringto discuss standard vs enhanced <br />lighting. <br />Other agency project updates: <br />• Ramsey County <br />o County Road C 4:3 Conversion from Lexington Avenue to Little Canada Road and bridge <br />over railroad <br />Roadway scheduled for 2026 and bridge in 2027. <br />o Fairviewfrom Larpenteurto CR B2 <br />Resurfacing and signalwork, at County Road B and Gluek Lane, in 2026. <br />o County Road Dfrom FairviewAvenue to Cleveland Avenue <br />Design in processfor2027 projectto include resurfacing and construction of a <br />path on the south side. <br />o Victoria Path from County Road C to Harriet Avenue <br />Design in processfor2027 project. <br />o Rice from Wheelockto County Road B <br />Design in processfor2028 project. Public meeting held February5. <br />o Larpenteur Corridor Study <br />RFP to be released soon for study of entire corridor. <br />• MnDOT <br />o Snelling Avenue from TH 36 to Grey Fox Road <br />2026 resurfacing to include off -road pathway west of Snelling Avenue from Lydia <br />Avenue to Old Snelling. <br />o TH 280from Wabash Avenue in St. Paulto 135 W <br />2026 resurfacing. Virtual public meeting held February 11. <br />o Gateway Bridge Project <br />Interagency meeting kickoff scheduled forthe 2031 project on 135W, TH 36 and <br />12-14 bridges from Fairview to the east. <br />• Other <br />o G Line (Metro Transit) <br />Construction 2026-2028. <br />Engineering Updates: <br />• Staff will attend the City Engineers conference. <br />• Roseville hopingto have $6,000 more forwater efficiency rebatesto use until June 30. <br />• Michelle Pietrick retired February2 and we welcomed Roseville's new Finance Director Sam <br />Magureanu, previouslyfrom Little Canada. <br />Environmental& Sustainability Updates: <br />• Climate Equity Action Plan <br />o The next community meetingforthe plan willtake place on Wednesday, March 4, 2026, <br />from 5:30-8:00 p.m. at the Rose Room in the Roseville Skating Center. <br />o Staff and consultant paleBLUEdot LLC are reviewing comments from the latest Climate <br />Justice Advisory Group and staff group meetings on climate equity action plan draft <br />actions. <br />PWET Communications Memo Page 2 <br />Page 4 of 105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.