My WebLink
|
Help
|
About
|
Sign Out
Home
26_0519_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0519_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:08:58 AM
Creation date
5/20/2026 11:07:48 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/19/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been through public comment and will be discussed at the May PWETC meeting. City <br />Council will review the EAW on June 8. <br />• Li htin <br />o Intersection lighting in eastern Roseville planned for 2026. <br />o Owasso Hillsto decide standard vs enhanced lighting. <br />• Bike Plan <br />o The Bike Plan was presented to the Park and Recreation Commission on Mays, where <br />they also recommended that Council approve the Plan. A Council date isTBD. <br />• Rosebrook Park <br />o Parks will be removingthe existing southern parking lot, playground, and kiddie pool at <br />Rosebrook park soon, and putting in a new larger parking lot, splash pad, and <br />playground. <br />Other agency project updates: <br />• Ramsey County <br />o County Road C 4:3 Conversion from Lexington Avenue to Little Canada Road and bridge <br />over railroad <br />Roadway scheduled for biddingthis spring and construction this summer/fall <br />and bridge construction in 2027. Utility work ahead of project is underway. <br />o Fairviewfrom Larpenteur Avenue to County Road B2 <br />Bids opened for resurfacing and signalwork, at County Road B and Gluek Lane. <br />Work can begin now, hard closure can't occur until June 11. Workto be <br />complete by State Fair. <br />o County Road D from Fairview Avenue to Cleveland Avenue <br />Design in process for2027 project to include resurfacing and construction of a <br />path on the south side. <br />o Victoria Street Path from County Road Cto Harriet Avenue <br />Design in process for2028 project. <br />Public Open House scheduled for May 20 from 5:00-7:00 p.m. at the Roseville <br />Skating Center. <br />o Rice from Wheelock Parkway to County Road B <br />Design in process for2028 project. <br />o Larpenteur Corridor Study <br />RFP to be released soon for study of entire corridor. <br />• MnDOT <br />o SnellinaAvenue from TH 36 to Grey Fox Road <br />Construction underway. Expect lane closures and short-term closures of side <br />streets when there is work nearby. Anticipate two weekend directional closures <br />with detours. Construction to be complete by State Fair. <br />Resurfacing and road repairs also include new off -road pathwaywest of Snelling <br />Avenue from Lydia Avenueto Old Snelling and completion of sidewalk behind <br />Slumberland to the frontage road. <br />o TH 280 from Wabash Avenue in St. Paulto 135 W <br />Resurfacing and bridgework underway. 280 is closed both directions forthe full <br />highway length. Reopening lanes prior to State Fair. <br />Note that 1-94 has another closure anticipated May30, 10:00 p.m. thru June 1, <br />5:00 a.m. Closure from 35E to 35W eastbound and to Dale Street westbound. <br />PWET Communications Memo Page 2 <br />Page 4 of 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.