My WebLink
|
Help
|
About
|
Sign Out
Home
pm_850102
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
198x
>
1985
>
pm_850102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:32:35 PM
Creation date
12/15/2004 7:37:11 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
1/2/1985
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning Coramission Hih_Jes - January 2, 1985 <br />Page 3 <br /> <br />Planning File 1569, Cont'd: <br /> <br />7. At the earliest stages of this proposal, both the Planning Comaission and the <br />Council expressed concern regarding the exterior materials to be used. It is <br />important that brick be the exterior material. <br /> <br />Mr. Dahlgren indicated the landscaping plan is well done. <br /> <br />Mr. Dahlberg, architect for the applicant, made a presentation concerning the <br />project. Mr. Dahlberg indicated the rock face concrete block is the appropriate <br />exterior material for this project. He indicated the scale of the block, which is <br />larger than brick, is more appropriate for this development. The rock face block is <br />not sub-standard material; it is the correct material for this project. <br /> <br />Discussion <br /> <br />Berry asked what the plan is for serv~c~ng the shops on the second level of the <br />center. Dahlberg indicated there are entrances via stairs on the rear of the <br />building. <br /> <br />Dressler asked whether the HVAC equipment will be visible from Fairview. Mr. <br />Dahlberg indicated all equipment on the roof of the east wing will be visible and <br />\oli11 have to be screened. <br /> <br />Matson asked how the traffic and lights will be screened from the residents to the <br />north. Dahlberg indicated there will be dense planting of evergreens and a vine- <br />covered cyclone fence. He indicated it will take some time for the evergreens to <br />grow into a dense screen. Dahlberg also indicated the grade at the north has been <br />revised to make it less steep. <br /> <br />Matson asked about the trash enclosures. Dahlberg indicated the trash enclosures <br />will be constructed of the same material as the building. They will be open on top. <br />The trash enclosures will be at the rear of the building. <br /> <br />Johnson indicated she was concerned that trash be collected during reasonable hours. <br /> <br />Berry asked how the northern side of the building would be lighted. Dahlberg <br />indicated there will be down lighting on the wall. <br /> <br />Matson asked what is involved in maintenance of the ponding area. Drown indicated it <br />is essentially a grass-cutting job. <br /> <br />Matson asked whether the pond will handle all of the increased drainage. Drown <br />indicated the pond only handles water from the two new centers, and should work well. <br /> <br />Matson asked whether the right-of-way dedication on Fairview is a problem. Dahlberg <br />indicated it was not. <br />
The URL can be used to link to this page
Your browser does not support the video tag.