Laserfiche WebLink
<br />ROSEVILLE PLANNING COMMISSION <br /> <br />Page 9 <br /> <br />Wednesday, July 11, 1990 <br /> <br />Stokes commented on how can one measure the rate. Keel stated <br />that the ordinance doesn't address rate but direction and damage <br />to a home. <br /> <br />DeBenedet questioned on whether there was a storm sewer on County <br />Road B-2. Keel stated that there was with a catch basin on <br />Cohansey. DeBenedet commented that the gutters could be designed <br />so that all the water is directed to the front. <br /> <br />Johnson stated her apprehensions on moving ahead. <br /> <br />Berry commented that they have no grounds to deny permit. The <br />size is more than required, the promise that this lot would never <br />be developed is unfortunate. Johnson stated that she has <br />reservations, and wants to make sure all options are covered. <br /> <br />Kaufman stated that all the neighbors have water in their <br />basements during the spring time. <br /> <br />Hasek stated there is potential for similar development on the <br />adjacent lot and diagramed how the two adjacent lots could be <br />combined and developed which would yield six lots. <br /> <br />Johnson stated that it was unfortunate but the lot split was <br />legal. Berry stated that splits like this in the past have <br />worked out. DeBenedet commented that the homeowners should <br />consult with engineering about grading. <br /> <br />MOTION <br /> <br />DeBenedet moved and Berry seconded to recommend that the lot <br />split be approved with the following conditions: <br /> <br />1. That staff provides analysis of the drainage issues to the <br />Council. <br />2. That the additional assessments be paid. <br /> <br />Roll Call: <br /> <br />Ayes: <br /> <br />Berry, DeBenedet, Johnson, Roberts, <br />stokes, Wietecki <br /> <br />Nayes: <br /> <br />None <br /> <br />Planninq File 2072 <br /> <br />Marna Mellberg request vacation of a drainage easement at 1220 <br />Josephine Road. <br />