My WebLink
|
Help
|
About
|
Sign Out
Home
pm_030205
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
200x
>
2003
>
pm_030205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:36:07 PM
Creation date
12/15/2004 8:04:18 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
2/5/2003
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Member Stone asked if there will be 95 underground spaces (yes). Traffic signage should be required in the final <br />plan. <br /> <br />Member Traynor asked for clarification of the parking space numbers. Thomas Paschke explained the senior <br />housing parking experience has shown less parking demands than normal market rate housing. Proof of parking is <br />required for projects on this site. <br /> <br />Member Bakeman explained that she has visited senior centers where parking permits are used for the more <br />mobile seniors. They tend to be more mobile. Member Duncan noted that if required, the developer may add 66 <br />spaces to meet the normal standards. <br /> <br />Bob Van Slyke, Presbyterian Homes applicant, said the building will be entirely rental units, but owned by <br />Presbyterian Homes. A rental entrance fee will be required. Presbyterian Homes will be the property manager, <br />similar to their project in Shoreview. He worked with adjacent Roseville Covenant Church to add space for a <br />training room, through a private entrance. A workshop on the lower level will be added for residents and church <br />seniors. A small movie theater will be used similarly. An exercise area will also be constructed. Bob Van Slyke said <br />this will be one of the larger, higher quality buildings with two bedroom units for younger seniors (as per their <br />market study). <br /> <br />Presbyterian Homes proposed to phase out the east side of the existing shopping center first, relocating tenants to <br />the west side and eventually to the new building. Construction would begin mid-summer 2003. The three-lot <br />subdivision will be configured approximately along existing office lot lines and parking areas for each site while <br />including cross parking and access. The proposed lot 3 is not planned for immediate development. The landscape <br />plans are now complete. Lighting plans are still being prepared. <br /> <br />Member Bakeman supported use with the Church. What changes have been made since the original plan? The <br />biggest change is reduction to four stories. John Gould, project architect, explained the height change to a four- <br />story height with 14,000 s.f. of retail. The building has now been moved back from Hamline another 15 feet to allow <br />two-sided one-way parking. <br /> <br />Mr. Gould described the architecture and design of "streetscape". The tower along the southeast corner is <br />approximately 70 feet in height with translucent panels. The building is broken into vertical sections as well as <br />horizontal bands of materials. <br /> <br />Member Traynor asked for the rental rates of the units. Mr. Van Slyke explained the rent will be $1.21/s.f. with an <br />average rental entrance deposit of $45,000. The profile of the senior occupant will be younger than 75 years, aging <br />in place, seniors who currently live in the community or seniors who wish to locate closer to children. The developer <br />will promote locally through the local papers and site signage. <br /> <br />Member Duncan asked if the entry fee is treated as a share in the project (no). It does not have an interest return, <br />but it does reduce the average rent of the units. <br /> <br />Member Traynor asked if local neighbors/residents could use the site. Mr. Van Slyke said there will be community <br />use of some space, and may be available to other seniors in the area. <br /> <br />Member Ipsen asked how to implement common retail space in a residential building. Mr. Van Slyke said they own <br />a similar project in Bloomington which is very successful. <br /> <br />Member Traynor asked for experience with parking in other projects. Mr. Van Slyke noted the Shoreview project <br />hardly has need for exterior parking. <br /> <br />Member Peper asked for clarification of the entrance deposit. <br /> <br />Member Stone asked for vacancy rates in Shoreview and Bloomington. (Each is full and has waiting lists). She <br />asked for details of the "beacon on the tower" - will it be discreet? Mr. Gould said there will be a low light level, no <br />downcast lighting. <br /> <br />Member Bakeman asked if the commercial uses will have two employees per business. Mr. Van Slyke stated two <br />employees will be in the housing area. What type of business would locate there? Mr. Van Slyke proposes a barber <br />and beauty shop, Aurelios Pizza, a dental office, insurance office, optical shop - tenants in the existing center. She <br />asked for details of the exterior business signage to attract the neighborhood? Restrictive sign covenants will be in <br />place. Signage is still being designed and in context with the neighborhood and pedestrians. Member Bakeman <br />asked for details on retail access from the residences (only one space will have access at the south end). <br /> <br />Member Duncan asked what type of uses would not be allowed. Thomas Paschke suggested low traffic, <br />neighborhood complimentary uses which will be described as permitted uses in the PUD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.