My WebLink
|
Help
|
About
|
Sign Out
Home
pm_040505
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
200x
>
2004
>
pm_040505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:36:14 PM
Creation date
12/15/2004 8:04:31 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
5/5/2004
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />In February 2004 the Planning Commission provided Greenhouse Village Properties comments and direction <br />regarding a sketch plan proposal. Greenhouse Village Properties also held a neighborhood meeting regarding the <br />proposed development. Comments from the Planning Commission, residents, and staff have been taken into <br />account in the submitted plans. <br /> <br />The town home proposal will consist of two structures of four and three unit (7 total units) complexes fronting on to <br />Larpenteur Avenue. Each town home unit will have a slightly elevated main floor entry. Stairs will bring residents <br />and guests up to the main entry door (typical of a "row home" design). Each unit will have a second story with an <br />estimated roof peak height of approximately 32 feet from the main level (front) grade. Units will include an entry <br />porch and a front sidewalk will be provided the length of the town home parcel and to each unit. Each unit will have <br />2 tuck-under garage parking stalls. <br /> <br />The structure will be that of a "craftsman" design, with stone and durable cement board lap and shake siding. <br />Asphalt shingles are proposed for roofing and the soffit and fascia will be protected by a maintenance free material. <br />The town homes are to be designed and finished to complement the senior cooperative. <br /> <br />A single primary access to the site is proposed from Larpenteur Avenue. Access to the town home garages will be <br />via a driveway extension easterly from the primary access, which road provided individual access to each garage. <br />A perpetual access easement/agreement will be necessary for all access roads including those associated with the <br />town home development. The joint driveway will be screened along the east and north side from the adjacent <br />single family homes by landscaping and a green house. <br /> <br />The "General Concept Plan" has established setbacks as follows: A minimum front yard (south) setback adjacent to <br />Larpenteur Avenue of 30 feet; a minimum rear yard (north) setback (private access road) of 22 feet; a minimum <br />side yard (east) setback of 20 feet; and a minimum side yard (west) setback adjacent to the main access form <br />Larpenteur Avenue of 20 feet. No individual driveways will enter on to Larpenteur Avenue. <br /> <br />Thomas Paschke explained utilities and the need to connect and loop to water lines east of Key's Restaurant and <br />north to Dionne Street <br /> <br />Visitor parking will be accommodated within driveways and from the 10 shared parking stalls directly northwest of <br />town home "Building B." <br /> <br />The Townhomes (Phase 3) consisting of 7 units and the associated land will be rezoned to Planned Unit <br />Development (PUD) with an underlying zoning of R-6, Townhouse District. <br /> <br />Thomas Paschke explained the Comprehensive Plan process. <br /> <br />Greenhouse Village is a phased development. Phase 1 consists of a 3 story, 54 unit senior cooperative and an <br />attached activity building. The cooperative structure is "L" shaped, with the majority of the structure having a <br />presence along the east property line. Phase 2 consists of a 3 story, 51 unit senior cooperative, also an "L" shaped <br />design, with the majority having a presence along the west property line. 113 underground parking spaces are <br />proposed, which is slightly more than 1 per unit. The project will create housing for approximately 174 new <br />residents. <br />Thomas Paschke explained impacts: traffic (404 in a 24 hour period) noting that Larpenteur has the capacity to <br />serve this proposal; parking on the site (145 spaces) meets the City Code requirements. A proof of parking <br />agreement for ten additional spaces will be required. <br /> <br />The senior cooperative will include building materials consistent with the City Code including stone, durable cement <br />fiber board lap siding, shakes and trim, aluminum or vinyl windows and doors. Decks will be provided for a number <br />of the units, but no all units. Thomas Paschke also explained site lighting and mechanical equipment impacts. He <br />explained/illustrated the elevations. <br /> <br />Staff recommends approval with conditions as per the project report dated May 5, 2004. <br /> <br />Chair Mulder requested details on the zoning of the surrounding sites. Member Stone requested density details <br />(approximately 20-25 units/acre) and asked what could be built within the existing B-2 zone. <br /> <br />Member Bakeman asked for details regarding Fire Protection (Fire Marshall has reviewed and added conditions for <br />fire suppression). The building must be sprinklered. <br /> <br />Member Bakeman asked for details of parking within Townhomes - how large will the garages be. Are the <br />townhome garages large enough to store bikes, etc.? <br /> <br />Member Traynor asked for details of traffic trips; how many cars will be owned per resident (no answer). Limited <br />parking limits the traffic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.