Laserfiche WebLink
<br />pathway on this right-of-way for connection into Minneapolis, <br />construction is anticipated in 2006. The Northeast Diagonal Land Use/ <br />Transit Study Report will be completed in 2002. This will identify future <br />corridor land use as well as define the feasibility of Transit for the BN RR <br />corridor. Figures Trans-4 and Trans-5 show this corridor. <br /> <br />Roseville Comprehensive Plan - 2003 Update <br /> <br />Transportation - Page 10 of 28 <br />