My WebLink
|
Help
|
About
|
Sign Out
Home
2006-11-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2006
>
2006-11-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 4:15:13 PM
Creation date
6/7/2007 9:51:53 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/28/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />John Stark, Community Development Director <br />City of Roseville <br /> <br />November 17, 2006 <br />Page 15 <br /> <br />County Road C at Cleveland Avenue <br /> <br />Construct an additional southbound left-turn lane (dual left-turn lanes) <br />Construct a dedicated westbound right-turn lane (with turn lane storage) <br />Construct a nOlihbound right-turn lane (Scenario lA only) <br />Extend the existing eastbound left-turn lane (Scenario lA only) <br /> <br />County Road C at Fairview Avenue <br />Construct right-turn lanes for the eastbound, westbound and southbound approaches <br /> <br />County Road C at Snelling Avenue <br /> <br />Construct an additional north and southbound through lane along Snelling Avenue <br />(6-lane facility) (assumed for existing conditions) <br />Construct an additional eastbound and westbound left-turn lane <br />(dual left-turn lanes) (assumed for existing conditions) <br />Construct a westbound right-turn lane <br /> <br />Snelling Avenue at County Road C2 <br /> <br />Construct an additional north and southbound through lane along Snelling Avenue <br />(6-lane facility) (assumed for existing conditions) <br />Construct an additional eastbound left -turn lane (dual left-turn lanes) <br />Extend the existing westbound left-turn lane <br />Construct a westbound right-turn lane <br /> <br />Snelling Avenue at Lvdia Avenue <br /> <br />Construct an additional north and southbound through lane along Snelling Avenue <br />(6-1ane facility) (assnmed for existing conditions) <br />Construct an additional eastbound left-turn lane (dual left-turn lanes) <br /> <br />Cleveland Avenue at I-35W Northbound Ramos <br /> <br />Construct an additional nOlihbound left-turn lane (dual left-turn lanes) <br />Construct a northbound right-turn lane <br />Extend existing southbound left-turn lane <br />Construct an additional eastbound left-turn lane (dual left-turn lanes) <br />Construct an eastbound through lane <br />Construct an additional eastbound through lane (Scenario lA only) <br />Construct an eastbound right-turn lane <br />Construct a westbound left-turn lane <br />Construct a westbound through lane <br />Construct an additional westbound through lane (Scenario lA only) <br />Construct a westbound right-turn lane <br /> <br />Cleveland Avenne at County Road C2 <br /> <br />Install traffic signal <br />Construct a westbound right-turn lane <br />
The URL can be used to link to this page
Your browser does not support the video tag.