My WebLink
|
Help
|
About
|
Sign Out
Home
2006-11-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2006
>
2006-11-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 4:15:13 PM
Creation date
6/7/2007 9:51:53 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/28/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />John Stark, CommunIty Development Director <br />City of Rose vi lie <br /> <br />November 17, 2006 <br />Page 16 <br /> <br />Cleveland Avenue at County Road D <br /> <br />Construct two northbound left-turn lanes (dual left-turn lanes) <br />Construct a northbound through and through/right-turn lane <br />Construct an eastbound left-turn lane <br />Construct an eastbound right-turn lane <br /> <br />Countv Road D at 1-35W Northbound Ramps <br /> <br />Construct a westbound right-turn lane <br />Extend the existing northbound right-turn lane <br /> <br />County Road D at Fairview Avenue <br /> <br />ElimInate the northwest approach (New Brighton Road) to create a 4-legged <br />IntersectIon <br />Convert County Road D to a three-lane section between Cleveland A venue and <br />Fairview Avenue with a continuous center left-turn lane <br />Install traffic signal <br />Construct a northbound left -turn lane <br />Construct a southbound right-turn lane <br /> <br />Fairview Avenue at Lvdia Avenue <br /> <br />Install traffic signal <br />Construct a northbound right-turn lane <br />Construct a southbound left-turn lane <br />Construct a westbound right-turn lane (Scenario lA only) <br /> <br />Fairview Avenne at Terrace Drive <br /> <br />Install traffic signal <br />Construct an eastbound and westbound left -turn lanes <br />Construct two eastbound and westbound through lanes <br />Construct an eastbound and westbound right-turn lane <br />Construct a northbound left-turn lane (Scenario lA only) <br />Construct a southbound left-turn lane (Scenario lA only) <br /> <br />TRAVEL DEMAND MANAGEMENT <br /> <br />In addition to adjacent roadway geometric improvements, other strategies are available to reduce <br />the amount of traffic that a development/redevelopment generates (Travel Demand Management <br />(TDM)), thus affecting the way the adjacent roadway operates. The purpose of TDM measures <br />is to encourage resIdents, employees and visitors of a particular development/redevelopment to <br />use alternative modes of transpOliation or modifY the current mode of vehicular utilization (i.e., <br />car pool, remote telecommutIng, flexible work schedules, etc.). The implementation of TDM <br />measures need to be facilitated by the developer or subsequent property owners/operators with <br />continual suppOli from City staff. The following proposed actions are provided as a guide <br />toward TDM strategy implementation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.