Laserfiche WebLink
Regular City Council Meeting <br />Monday, July 14, 2008 <br />Page 13 <br />Background: collection program in place sine 1970; fee for service since 1998; <br />approximately 4500 annual participants prior to 1998; participation slowly declin- <br />ing; proposed fee for 2008 is $25; drop off volume at recycling site has increased. <br />Program challenges: weather is greatest impact on program cost; short window <br />to provide service (3 weeks); need enough resources to stay on schedule; requires <br />most street division staff plus temporary labor for clean up raking; some years dif- <br />ficult to meet customer expectation. <br />Program costs: $77,763 total cost for 2007; 1321 participants/approximately <br />15% of single family residences; $26,420 user fees collected; estimated $42,000 <br />in street and catch basin cleanup required without program; 2007 storm utility <br />subsidy $7.07/user. <br />Options for Residents: leaf collection program; backyard composting; mulching <br />mowers; lawn services; haul to recycling center; place at curbside for trash hauler <br />(may charge fee for this service). <br />Discussion: Return to no fee program could require additional $100,000 funding <br />or reduction in existing programs; high impact on existing resources; difficult to <br />contract program of this magnitude; specialty equipment required. <br />Councilmember Ihlan questioned the potential cost per household or per user to <br />fund the service by spreading out the estimated $100,000 of additional cost city- <br />wide through an increase in corresponding utility bills. <br />City Finance Director Chris Miller estimated that an additional $10/homeowner <br />per year would be required; and that it would require changes to the stormwater <br />utility policy, and would apply to businesses as well as homeowners. <br />Discussion included mandatory versus voluntary participation and challenges of <br />each; service charge for businesses based on their typical stormwater use; chal- <br />lenges in finding contractors for a mandatory program and additional equipment, <br />and implementing on a city-wide basis may require additional capital equipment <br />purchase and/or storage costs; and other options available, favored andlor utilized <br />by those not participating in the program. <br />Councilmember Willmus noting the continuing and steady decline of participants; <br />and his unwillingness to penalize citizens for using alternative options. Council- <br />member Willmus opined that it may be time to drop the leaf collection program <br />and retain the compost site. <br />Councilmember Ihlan opined the need to let the public know of any potential <br />changes; and suggested that due to decreased participation and increased costs, <br />the program may be cost prohibitive for some residents, specifically those senior <br />