My WebLink
|
Help
|
About
|
Sign Out
Home
res_2066
Roseville
>
City Council
>
City Council Resolutions
>
02xxx
>
res_2066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:06:30 AM
Creation date
4/23/2005 4:32:47 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
2066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Revised as of April 1, 1968 <br /> <br />VI. The Board and Roseville shall not be liable <br /> <br />for rea sonable interruptions in service, pr,ovided <br /> <br />however, that the Board shall not discriminate <br /> <br />against Arden Hills in the event of such <br /> <br />interruption, or for failure to deliver water <br /> <br />which results from failure of supply, inability <br /> <br />to secure necessary processing materials, <br /> <br />breakdown or damage to processing, pumping, <br /> <br />or transmis sion facilities, work stoppage or <br /> <br />other conditions beyond the control of the <br />Board. <br />VII. Arden Hills agrees to indemnify and save the <br /> <br />Board harmless from any and all claims or <br /> <br />demands for damages arising out of or which <br /> <br />may result from the water supplied pursuant <br /> <br />to this agreement and from the use, installation, <br /> <br />maintenance, and repair of its facilities as <br /> <br />set forth in this contract. <br /> <br />(b) It is agreed that additional water works facilities <br /> <br /> <br />will be necessary to enable the Board to deliver adequate water to <br /> <br /> <br />Roseville when the maximum daily demand of Roseville and Arden <br /> <br />Hills reaches 28 million gallons of water per day. It is further agreed <br /> <br /> <br />that Roseville shall pay the costs of providing these additional facilities, <br /> <br /> <br />which costs shall include the costs of engineering and construction, <br /> <br />and that the provision of such facilities and payments will be governed <br /> <br />by the following stipulations: <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.