Laserfiche WebLink
<br />KeVl sea a s of April 1, .l.;j 08 <br /> <br />1. It is the exclusive option of the Board to <br /> <br />determine when the additional facilities are <br /> <br />to be provided. <br /> <br />II. Determination of what specific facilities are <br /> <br />necessary to enable the Board to supply adequate <br /> <br />water to Roseville and Arden Hills over the <br /> <br />remaining years' of the contract, or for a re- <br /> <br />negotiated period of the Contract, will be <br /> <br />made by an Engineering Consultant mutually <br /> <br />agreeable to the Board and Roseville. When <br /> <br />the Board notifies Roseville of its intent to <br /> <br />proceed with the provision of a dill tional facilities, <br /> <br />Roseville, within a period not exceeding ninety <br /> <br />(90) days follOWing such notification, shal1'inform <br />the Board whether Roseville desires the facilities <br /> <br />sized for the remaining period of the Contract, <br /> <br />or for a renegotiated period of the Contract. <br /> <br />The additional facilities, however, will be <br /> <br />limited to increased capacity of supply lines <br /> <br />between the Board's McCarron's Pumping Station <br /> <br />and the site of the Dale Street Reservoir, and <br /> <br />additional storage capacity at the Dale Street <br />Reservoir site. Once the nature and estimated <br />costs of the additional facilities have been <br />determined by the Engineering Consultant, <br /> <br />-5- <br />