My WebLink
|
Help
|
About
|
Sign Out
Home
res_2066
Roseville
>
City Council
>
City Council Resolutions
>
02xxx
>
res_2066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:06:30 AM
Creation date
4/23/2005 4:32:47 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
2066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />KeVl sea a s of April 1, .l.;j 08 <br /> <br />1. It is the exclusive option of the Board to <br /> <br />determine when the additional facilities are <br /> <br />to be provided. <br /> <br />II. Determination of what specific facilities are <br /> <br />necessary to enable the Board to supply adequate <br /> <br />water to Roseville and Arden Hills over the <br /> <br />remaining years' of the contract, or for a re- <br /> <br />negotiated period of the Contract, will be <br /> <br />made by an Engineering Consultant mutually <br /> <br />agreeable to the Board and Roseville. When <br /> <br />the Board notifies Roseville of its intent to <br /> <br />proceed with the provision of a dill tional facilities, <br /> <br />Roseville, within a period not exceeding ninety <br /> <br />(90) days follOWing such notification, shal1'inform <br />the Board whether Roseville desires the facilities <br /> <br />sized for the remaining period of the Contract, <br /> <br />or for a renegotiated period of the Contract. <br /> <br />The additional facilities, however, will be <br /> <br />limited to increased capacity of supply lines <br /> <br />between the Board's McCarron's Pumping Station <br /> <br />and the site of the Dale Street Reservoir, and <br /> <br />additional storage capacity at the Dale Street <br />Reservoir site. Once the nature and estimated <br />costs of the additional facilities have been <br />determined by the Engineering Consultant, <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.