My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0126_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0126_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 3:24:10 PM
Creation date
4/20/2009 9:31:00 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o To meet MSA standards, this road will be constructed to a 9-ton design. For the purposes <br />� of assessment calculation, we reduce the estimated quantities to reflect the cost to build a <br />� 7-ton road. Also, since segments of the proposed road are 35 feet wide, we subtract the <br />� costs to construct the additional 3 feet of pavement. <br />, • No costs associated with sidewalk/ trail construction will be assessed to property owners. <br />, • No costs associated with new storm sewer construction will be assessed to property owners. <br />, • Any utility replacement/repair be funded by the appropriate utility fund and not become part of <br />� the assessable portion of the project. <br />. • New storm sewer facilities will be funded by MSA funds. <br />FINANCIAL IMPACTS <br />Fund the street reconstruction with Municipal State Aid funds, utility funds, and assessments as <br />shown in the table below: <br />Estimated cost MSA Assessments Utili Funds <br />Street Construction* $1,547,539.86 $1,210,654.90 $336,884.96 $0 <br />Sidewalk/ Trail Construction $166,392.60 $166,392.60 $0 $0 <br />Storm Sewer Construction $112,698.85 $112,698.85 $0 $0 <br />Sanitar Sewer Reconstruction $289,874.20 $0 $0 $289,874.20 <br />Watermain Reconstruction $393,961.70 $0 $0 $393,961.70 <br />Total $2,510,467.21 $1,489,746.35 $336,884.96 $683,835.90 <br />*cost includes 15% engineering <br />. In February, after we have prepared final plans and specifications, we will bring this project back <br />. to the City Council to authorize staff to solicit bids for the construction work. After receiving <br />. bids, we will review them in accordance with the budgeted amounts for this project and bring an <br />. award recommendation to the City Council. <br />� STAFF RECOMMENDATION <br />� Staff recommends that the City Council order these proposed public improvements consistent <br />� with the feasibility report presented to the City Council on December 15, 2009 and located on <br />� the City's website at: www.ci.roseville.mn.us/roselawn. <br />� REQUESTED COUNCIL ACTION <br />� Approve a resolution ordering the improvement and preparation of plans and specifications for <br />� Roselawn Avenue between Hamline Avenue and Victoria Street. <br />Prepared by: Debra Bloom, City Engineer <br />Attachments: A: Resolution <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.