Laserfiche WebLink
Regular City Council Meeting <br />Monday, Apri127, 2009 <br />Page 7 <br />Ms. Bloom noted the participation and recommendations of community volun- <br />teers, both involved in and independent of the City's Public Works, Environment, <br />and Transportation Advisory Commission. <br />Mr. Schwartz advised that the outside consulting firm helping staff in this devel- <br />opment had originally planned a more traditional storm water system, but had <br />been pleased with and receptive to the input received from community volunteers. <br />Discussion included initial construction of the infrastructure components for <br />Phase I with oversized construction of some areas to allow expansion of the sys- <br />tem as future phases at Twin Lakes develop; more stability of the root system for <br />trees given this type of watering system; as well as native plants and more porous <br />soils. <br />Ms. Bloom and Mr. Schwartz addressed lighting issues, attempting to keep them <br />at a minimum for pedestrian use, anticipating additional lighting in the area as de- <br />velopment occurs. Ms. Bloom noted that street lighting had been bid for both in- <br />ductive or LED, with LED to be determined as an add/alternative to the bid <br />award. Mr. Schwartz advised that while LED was more efficient than inductive <br />lighting, inductive lighting was more technologically sound at this point. Ms. <br />Bloom noted that fixtures would be selected that could be converted in the future. <br />Ms. Bloom noted that, in order to avoid trucking costs, plans were that recycled <br />asphalt would be used as a base under roadways; and soils would be reused as <br />much as possible on site and for amending contaminated soils; and identified the <br />location of those buildings requiring demolition. <br />Mr. Schwartz provided cost estimates and comparisons of grant and design esti- <br />mates as follows: <br /> Grant Estimates Desi n Estimates <br />Roadwa $1,832,000 $1,885.890 <br />Utilities* 500,000 $959,163 <br />*Mr. Schwartz noted that utility costs had increased due to attempting a green <br />project, and oversizing the utilities to facilitate the entire project, not just limited <br />to Phase I construction. <br />Ri is-of-wa * 974,000 1,642,995 <br />*Mr. Schwartz advised that right-of--way costs had increased with the final relo- <br />cation of the roadway from the original placement, requiring acquisition of more <br />of the Indianhead arcel than originally estimated. <br />Sub Totals $3,306,000 $4,488,048 <br />Environmental clean u 678,672 <br />Grand Total $3,306,000 $5,166,720 <br />Mr. Schwartz summarized changes in costs for rights-of--way (including ap- <br />praisal/negotiation; temporary easements; demolition of structures; misc. acquisi- <br />