Laserfiche WebLink
surface spaces, or 71 total spaces. Sased on the proposal, resident and employee parking <br />� will be accommodated through enclosed parking located under the building at <br />� approximately 83 underground stalls and 19 visitor surface parking lot spaces. <br />� 7.19 Landsca�in� The applicant has indicated a strong desire to preserve as many trees as <br />� feasibly possible, especially those near the intersection of County Road S and Midland <br />� Grove Road and north along Midland Grove Road. The applicant will also attempt to <br />� preserve and/or transplant some of the apple trees that dot the property. As for proposed <br />� landscaping, the plan indicates boulevard trees, interior trees and shrubs throughout the <br />� site. Shrubs would act as a natural screen for the main level patios and all storm water <br />� management areas will require some from of heightened landscape. <br />� 7.20 Pathwavs and Sidewalks: Section 1013.07 of the City's Code requires that new non- <br />� motorized pathways be constructed as part of new development on properties that are <br />� designated through the official pathway system plan. However, the plan does not <br />� indicate sidewalk or path requirement along the north side of County Road S. The DRC <br />� is recommending a sidewalk from Midland Grove Condominium parcel to County Road <br />� S adjacent Midland Grove Road and looking into a way in which sidewalk can be <br />� provided from Midland Grove Road to Cleveland Avenue, where the identified crossing <br />� lies. <br />� 7.21 Storm Water: Storm water will be collected and treated on site. The conceptual storm <br />� water management plan indicates three infiltration areas, one at the rear of the building to <br />� assist with adjacent property drainage, and the other two in the southwest corner of the <br />� property. <br />� 7.22 Sanitarv Sewer and Water: Sanitary sewer and water will be provided by a water main <br />� and sanitary sewer connection located within County Road S. <br />� 7.23 Private Utilities: The private utilities, such as electricity, cable, telephone, and natural <br />� gas, will be designed and coordinated through the Public Works Department to be <br />� underground and utilize a joint trenching system, where applicable. <br />� 8.0 STAFF COMMENTS: <br />� 8.1 On February 19, 2009, the applicant and Station 19 Architects held the required open <br />� house for the proposed (revised) Orchard development. There were between 20 to 25 <br />� property owners/residents in attendance. Informal discussions centered on <br />� questions/concerns regarding treatment of east side with special features to mitigate <br />� visual impacts; color and types of building materials; blending more into the adjacent <br />� neighborhood; request for additional signs for speed; traffic increase along Midland <br />� Grove Road; increased landscaping; transplanting of evergreen trees; discussion about <br />� keeping second drive on Midland Grove Road; access to County Road S; fire/safety <br />� aspects of building; and balcony usage (see attached narrative) . <br />� 8.2 On February 26, 2009, the Roseville Development Review Committee (DRC) met to <br />� review the revised plans for the Orchard. The DRC supported the change in <br />� Comprehensive Land Use Map designation to High Density Residential; the zoning to <br />� Planned Unit Development; and the proposal as proposed prior to the Planning <br />� Commission meeting. <br />� 8.3 Since the March 4, 2009 Planning Commission meeting, the Planning Division has <br />� received and reviewed a revised site plan and building elevation. This proposal though <br />' similar to the design reviewed by the Commission, includes a number of enhancement <br />PF09-002 RCA 051109.doc <br />Page 7 of 8 <br />