My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0615_ Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0615_ Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:52:23 PM
Creation date
7/28/2009 2:44:17 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3 — Canstruction <br />Staki ng <br />HKgi will also provide construction observation in the forrn of interim progress <br />review of installation and material inspection of the pavers, lighting, irrigation <br />plants and planting soils, They will provide a weekly walk through of the project <br />and create punchlist related items. They will also provide staking review and <br />approval, ta ensure the ]andscape and iighting plan ronstructed accorcfing to rl�e <br />pian. <br />Estimated hours and fees for this task: <br />p W5B Inspectar: 24 weeks x 48 hrs/wk x$86/hour =$99,07Z <br />� Ana Nelson (HKgi): 12 weeks x 10 hrs/wk x$90/hour =$10,800 <br />� Pau1 Paige (HKgr): 1 Z weeks x 2 hrs/wk x$135/hour =$3,240 <br />ToCa1= $113,112 <br />WSB will provide construction staking for the project. Camponents of the staking <br />a re: <br />■ Line and grade stakes for all utility impravements <br />° Cut sheeis for all utility improvements, including the infiltration basin and <br />cistern. <br />■ Line and grade stakes for all street improvements, including curb stakes, <br />sidewalks, etc. <br />° Cut sheets for all street improvements <br />■ Collect the survey data needed for the record drawings, incl�ding top nut of <br />hydrants, top of casting, and invert elevations of ali storrn and sanitary sewer <br />structures. <br />�'stimated hours and fees for this task: <br />■ Stakrng: 24 weeks x I5 hours/week x$140/hour (2-person crew) =$50,400 <br />� As-Built Survey: 50 haurs x$140/hour (2-person crew) _$7,000 <br />! Tara! _ $57,400 <br />Task 4— Record Drawing WSB will prepare thE record drawings l�ased on the as-built survey information. <br />Preparaiion The record drawings will be prepared in accordance with Ehe requirements of the <br />City of Roseville. WSB's Field empkoyees are trained in CADD safEware and are <br />readily available at the cotnpletion af the construction season to provide timely <br />preparation of the record drawings. Digital files can be provided if requested. <br />� <br />� <br />����:.:�r��: <br />Estimated haurs and fees for thf� task: <br />■ 40 hours x $8b/hour = $3,440 <br />-3- <br />�� <br />�� <br />� <br />O <br />:�7 <br />� <br />� <br />� <br />� <br />\ <br />� <br />n <br />� <br />[r9 <br />d <br />C <br />r~ <br />t�7 <br />\ <br />� <br />rn <br />Cz7 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.