My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0615_ Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0615_ Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:52:23 PM
Creation date
7/28/2009 2:44:17 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB and Associates, Inc. <br />Proposal BL-08-02387D <br />Apri1 Z1, 20�9 <br />Page 2 <br />Scope of Services <br />We will pro�ide tethnirians or engineer5 — working under the direttion of a Professional �ngineer — to <br />perfarm our observation and testing services. Observation and testing ser�ices wil! be perfarmed on <br />an on-call, as-needed basis as requested and scheduled by you or the proje�t contractars. We have <br />re�iewed the available project information and propose to: <br />° Observe and e�aluate the suita�ility of geologic materials exposed in the botto�'+s of road and <br />utility excavations or surfaces for fifl and/or structure/road support. <br />a Observe and eval�tate ti�e suitability of prospective fill materials. <br />• Measure the in-piace dry density, moisture content and relative compaction of fiil placed <br />for pa�ement and/or utility support, and of utility back.fill for compliance with the project <br />documents — this task includes �erforming �aboratory Proctor tests to provide maximum dry <br />densities frarr� which the relative eompaction of fill can be determined, as welE as the use of <br />a nuclear density gauge ta measure in-place dry densities and moisture contents. <br />= Observe proaf-rolls of paveinent subgrades to e�aluate subgrade strength and the ability of <br />the subgrades to support pavement materials. <br />■ 5ampl.e and test aggregate base and �ituminous �a��ment materials for tompEiance with the <br />project documents --this task intludes laboratory gradatian and Proctor testing of aggregate <br />base materia! and Rice specific gravity, Marshal4 density, asphalt content and extractec4 <br />aggregate gradation tests of the bituminous. <br />■ MeasUre the temperature of the bituminous pavement at initial laydown and durirtg rof�ing for <br />compliance with the project documents, and to help the contractor de�elop a roll pattern for <br />effective compaciion. <br />■ Measure the in-place density of the fresh bituminous with a nuciear density gauge to help the <br />contractor de�eiop a rall patter� for effective compa�tinn. <br />■ Measure the thickness and density a# the compacted bituminous pavement by the core method <br />for complianc� with tf�e project documents — this ta�k inc�udes coring equipment rentai. <br />■ Sample and test fresh contrete a5sociated with curb-anci-gutter and sidewalks €or co�npliance <br />with the project docu.ments, and cast test eylinders for laboraiory campressive strength testing, <br />We assume that we will be able to appropriately dispo5e of excess concrete (and associated <br />wash water) on site at no additional east to us, <br />� Measure and report the compressive strength of the co�crete test tylinders fo� compliance with <br />the project documents. <br />� ��� �� <br />II�T�� � E� <br />
The URL can be used to link to this page
Your browser does not support the video tag.