My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0615_ Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0615_ Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:52:23 PM
Creation date
7/28/2009 2:44:17 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W5B and Associates, Inc. <br />Proposai BL-08-�2387D <br />April 21, 2009 <br />Page 3 <br />■ Provide project managerr�ent for the quality contral observakion and testing services destribed <br />abov2 — this task inc�udes scheduling field personr�el, reviewing observation and test reports, <br />and cammunicating with you, the projeCt contractorts), other project team members and the <br />building officiaE, as needed. <br />Sch�du�ing Assumptions <br />Based on our understanding of the project and the avai{able project information, we assume the work <br />for this phase of the project will proc�ed according to t�e follawirrg schedul�s: <br />tl Ger�eral road grading and excava#ion, and the placement and compaction of exca�ation backfill <br />and required additional fill for pavement areas, will be substantially compleie in two weeks. A <br />technician in anticipated to be onsite �alf-time during this time for corrypaction testing, <br />■ Utility installations will be substantially Complete in six weeks. A technitian is anticipated to be <br />onsite half-time for tampaction testing, <br />d Periodic excavatian observations of road, structure and pipe subgrades are ar�ticipated during <br />road and utility installation. We ha�e anticipated 20 ho�trs onsite for an engineering assistant or <br />geotecfi�nical engineer ta e�aluation the suitability of subgratles. <br />m P�acement and comgac#ion of bituminous pavernent will be substantially complet� in six days. <br />■ Concrete pavement/sidewalks will be compfeted in twelve plac�ments and curb-and-gutter will <br />also require twelve placements. <br />ff the pace of construction is different than described above, this proposal shv�ld be revised. <br />C05� <br />We wifl furni5h the servites descrit�ed herein for art estimated fee of abaut $ 37,316. A tabulation <br />showirtg haurly and/or unii rates assaciated with o�ar propased sc4pe of services is attached. <br />Our work will ex#end over several in�oi�ing periods. As such, for work that is �erformed during the <br />tourse of each in�oicing period, we wilE subrr�it partial progress invaices. <br />Additional Services and Over�ime <br />It is ciifficult to estimate all of the services, and the �uar�tity of eac� service, that will be required for any <br />project. Our services are also directly cantrolled by the schedule and performance of others. For these <br />reasons, our actual hourly or un+t quantities and associated fees may vary from ihose reported he�ein: <br />� ��� � <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.