Laserfiche WebLink
� <br />to determine the rate per foot this rate would be closer to what has historically been the <br />assessment rate. This Option is consistent with how we calculated the assessment rate for the <br />S. Owasso Blvd Project. <br />We recommen� that the City proceed with Option B to set the assessment rate for this reconstruction <br />proj ect. While the rate is still higher, this is consistent with what we have been experiencing with <br />construction proj ects. With the increases in the price of oil, we have seen all of our proj ect costs <br />increase in the last 5 years. <br />STREET ASSESSMENT SUMMARY <br />Estimated total street construction ro'ect cost {9-ton road $741,984.38" <br />Estimated 32 foot wide/ 7-ton road construction ro'ect cost $592,390.62" <br />Ci of Roseville share of cost 50% $296,195.31" <br />O tion B total assessable foota e 2640 <br />En ineer's recommended for street assessment: <br />100% of ro'ect cost/foot $112.20 <br />25% of ro'ect cost/ foot $28.05 <br />*Note: this table only includes street reconstruction costs. The totals will not match up with the <br />totals on other funding tables in this council report. <br />Assuming this proj ect is completed by fall 2006, the final assessment amount would be <br />determined following an assessment hearing in the fall of 2007 and a thorough review of the <br />proposed assessments by the Council. <br />PROPOSED FUNDING: <br />CITY OF ROSEVILLE <br />ROSELAWN AVENUE RECONSTRUCTION <br />STREET, STORM SEWER, AND SIDEWALK FUNDING <br />MSA Funds $291,614.40 <br />r�k�tis;�_����L� ��41 _�i 1 �.��� <br />�• G���1 'i I i�l : r�: .�,���_[1 �� I: � <br />Ramsey County Turnback Funds $87,500 <br />Total $420,929.69 <br />Staff recommendation: ����a" r����rnti��,�nti�� that the City Council order these proposed public <br />improvements consistent �.�_ � li l€�:� I�71 I rtix��i r,� �eneral guidelines. <br />• Reconstruct Roselawn Avenue from Haamline Avenue to Snelling Avenue. <br />• Construct a 34-foot wide bituminous street with concrete B618 curb and gutter. <br />• Allow parking along the north side of the street. <br />• Construct a concrete pathway along the south boulevard. The pathway design shall be <br />8- foot wide attached to the curb. <br />